Laserfiche WebLink
City of Lino Lakes <br /> Park Board Meeting <br /> October 6, 1997 <br /> way this could be avoided in the future. Barry said when there <br /> is a new director that person will be able to keep on top of the <br /> issue and avoid this problem. Joe stated his concern about the <br /> speed. Barry will talk to Marty to see if the county has traffic <br /> counts on this road. Barry also felt Marty would have an update <br /> for the next Park Board meeting. <br /> 1996/1997 Trail Paving: Mike Hoffman included a memo, paving <br /> summary and map showing the locations of the trails scheduled to <br /> be paved in 1997 . Barry talked about the trail on Aqua Lane <br /> being part of the grant the city received. He added the trail on <br /> the rear of Marshan property has been done and is being used by <br /> several residents. Pam asked about the trail along the townhomes <br /> by the lake that keeps washing out . She wanted to know if this <br /> was going to be a problem after the trail was paved. Barry has <br /> not talked to the developer about this but will and let the board <br /> know what is going to happen. Kim asked about the trail by St . <br /> Joseph Church. Paul said the trail goes from Sunrise Drive to <br /> Sunset Road. Pam asked who is responsible for the trails on <br /> school property. Barry said the school district is . George <br /> asked the status of trails 3-6 . Barry said it is scheduled to be <br /> done in 1997 if it has not already been done. George asked if <br /> city staff was cutting and doing Class V on the trails . Barry <br /> said he thought it was being contracted. There was also <br /> discussion on trails along Birch Street . Joe asked if something <br /> was going to be done on Hokah to 49 . Barry did not know. Paul <br /> asked about a crosswalk where the trails goes from the north side <br /> to the south side on Birch Street . George said it would be <br /> connected into Country Lakes Park to allow residents to use <br /> tunnel over to Rice Lake Elementary School . Paul thought signage <br /> should be put up letting residents know so they do not cross <br /> Birch Street . George said his concern was that the trail be <br /> paved before the weather turned bad this fall . <br /> ANOKA ELECTRIC EASEMENT - UPDATE: <br /> Barry had a conversation with Mike Felber, Planning Engineer with <br /> Anoka Electric. Mike was fully aware of the project . He said <br /> they would like to start this project in the winter and complete <br /> it in the spring. At the present time, no permits have been <br /> sought or secured by Anoka Electric . Barry gave him permission <br /> to obtain the necessary permits . He would also like Mike to come <br /> before the board when the permits have been obtained to obtain a <br /> fair trade . George thought staff should be negotiating this, not <br /> the Park Board. <br /> 3 <br />