My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/04/1998 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1990 - 1998 Park Board Packets
>
1998 Park Board Packets
>
05/04/1998 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 2:55:16 PM
Creation date
7/9/2021 2:57:56 PM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
05/04/1998
Park Bd Meeting Type
Regular
Park Bd Publication Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning&Zoning Board <br /> March 11, 1998 <br /> Page 7 <br /> Tom Bruner, 270 Linda Avenue, expressed concerned regarding drainage, as his property <br /> is on a septic system. Mr. Ahrens responded that an 8" sewer line, which is standard <br /> throughout the City, should accommodate the proposed growth. <br /> Mr. Ahrens further explained that during growing season a wetlands delineation will be <br /> accomplished, which will determine buildable area. <br /> Mr. Herr pointed out that typically buildable area is shown in a preliminary plat approval <br /> request. Ms. Wyland explained that the existing pond has been delineated, and that the <br /> surveyor was confident that there is adequate buildable area. Mr. Ahrens added that the <br /> wetlands do not change in area from year to year,regardless of the weather conditions. <br /> Mr. Kirmis suggested that approval be conditioned upon determination of ample <br /> buildable area on Lot No. 1. <br /> Mr. Dunn suggested that this request be postponed pending determination of adequate <br /> sewer capacity and wetland delineation. <br /> Tony Sampaire, representative of Mr. Collova, stated that there is not intent to go forward <br /> with this project if the conditions outlined above are not met. <br /> Chair Schaps asked Mr. Sampaire if there is any financial reason why this project must be <br /> approved at this time. Mr. Sampaire responded that there is not, but that the developer <br /> would like to go forward as soon as possible. <br /> Mr. Ahrens added that any sewer capacity issue was addressed through the addition of a <br /> new area lift station. However, he added that further investigation of this issue would <br /> take place. <br /> Mr. Dunn made a MOTION to close the public hearing at 7:37 p.m., and was supported <br /> L by Mr. Gelbmann. Motion carried 6-0. <br /> Mr. Herr made a MOTION to table this request until such time as adequate sewer <br /> capacity,wetland delineation, and adequate buildable area for Lot 5 are determined, and <br /> until such time as the applicant has conducted a neighborhood meeting, and was <br /> supported by Mr. Johnson. Motion carried 6-0. <br /> C. Lakeland National Bank, North/West corner of Apollo Drive (extended) & <br /> Lake Drive, Site Plan Review <br /> Mr. Kirmis explained that Roger Kolstad has submitted a request to construct a 3,600- <br /> square-foot bank on a+35,400-square-foot parcel of land located north of the proposed <br /> extension of Apollo Drive and west of Lake Drive. The subject site is zoned GB (general <br /> business), which includes financial institutions as permitted uses. Mr. Kirmis highlighted <br />
The URL can be used to link to this page
Your browser does not support the video tag.