Laserfiche WebLink
Feb, 24. 1998— 1 : 35PM BRAUER & ASSOC. No, 0700 P. 4/4 <br /> 3tat ........,_,)St Ana,, ,, Lino Lakes Park Bond rcererenaum Planning <br /> Quail Ridge Park Cost Analysis Summary Statement <br /> Description of Cost Item Estimated Cost Assumptions and Clarifications <br /> General Site Removals and Site 3,500.00 Assumes relatively minimal existing vegetation removal and limited <br /> Preparation site preparation <br /> General Earthwork 8,000.00 As required to level open spaces and turf areas <br /> Abandonment of Water Service in 1,13W.00 If required,given existing hydrant located in middle of norther part <br /> Park Area of site <br /> Storm Sewer Piping 1,500.00 For culverts under trails <br /> Asphalt Trails 19,000.00 8'wide asphalt on aggregate base as per city standard design <br /> Boardwalk(New) 22,000.00 Floating boardwalk style as per city standard design(assumes work <br /> will be bid—substantial savings could be realized if built in-house or <br /> with in-kind neighborhood labor) <br /> Boardwalk(Replace Existing) 24,000.00 Floating boardwalk style as per city standard design(assumes work <br /> will be bid—substantial savings could be realized if built in-house or <br /> with in-kind neighborhood labor) <br /> Play Area Equipment,Concrete 45,000.00 Budget figure for listed items <br /> Curb Container,and Associated <br /> Walks <br /> Half-Court Basketball 8.650.00 Asphalt surface with aggregate base and Colorcoat surfacing.Heavy <br /> duty basketball standard <br /> Deck Overlook 8,000.00 Simple wood structure with bench <br /> Benches 2,500.00 As per city standard design(simple wood style preferred)-5 <br /> benches <br /> Picnic Tables 6,000.00 As per city standard design(simple wood style preferred)-5 tables <br /> Workout Station 4,500.00 Simple multi-use foxed position workout station(amenities not <br /> selected) <br /> Landscaping 10,000.00 Includes budget for sodding,seeding,and landscaping <br /> Miscellaneous Site Amenities 2,000.00 Wood duck boxes,Etc. <br /> Drinking Fountain 3,000.00 Taps into existing waterline servicing the hydrant.Heavy duty style <br /> Total oia=e Biid ltts it6fi,4 �Q The contingency of 10%is the minimal recommended at this level <br /> of design detail and project costing review.Also,it is difficult to <br /> ascertain what the bidding environment will be Ike at the time that <br /> the project will actually be built,thus justifying a more cautionary <br /> approach to potential project costs. <br /> 5urrejnngf {lfl!&j <br /> The design,engineering,and surveying fees are based upon <br /> Fit Budget { general industry standards for this type of project. <br /> ,n <br />