Laserfiche WebLink
COUNCIL MINUTES APRIL 26, 1999 <br /> Mr. Engstrom stated they hope to have the building plans in three (3)weeks. The schedule calls <br /> for ground breaking in June, 1999. The restaurant will open in August or September, 1999. <br /> Mr. Baylor, Developer for the project, added that bids are currently out for utilities and the <br /> building. He noted the project is very costly because of the depth of the utilities. <br /> Staff recommended the following conditions of approval for PDO Plan/Plat, Site Plan, and <br /> Conditional Use Permit: <br /> 1. All development except the Phase I McDonald's shall comply with the design <br /> standards in the report. Phase I shall comply with the approved site plan and any <br /> conditions of approval. <br /> 2. The access driveway onto Apollo Drive shall be a right-in only. <br /> 3. East side access drive shall meet the private road at a rig g"" d ve lane <br /> will be straightened. <br /> 4. Eliminate the five (5) stalls on the front of the bull Z64 an outdoor area for <br /> seating unless or until a playland is built. "R <br /> 5. Create two (2) landscaped islands in the parkifg lot, one at each end of the double row <br /> of stalls. A tree shall be saved ilithe from island if possible. <br /> 711;6. The landscaping plan shad be xviewed for approval by the City Forester. <br /> 7. Pro er b p ust be obtained prior to any construction and 1%of the <br /> construction c t be s"t in escrow to insure completion of all site improvements. <br /> Prior td ce building permits, building plans must be reviewed by the City CSO <br /> for com N`CPTED recommendations. <br /> 8. A ligh g plan must be submitted and obtain approval by the CSO for compliance <br /> with CPTED recommendations. <br /> 9. Any signage shall be reviewed for approval by the Town Center Committee. <br /> 10. All permits required by the Rice Creek Watershed District shall_ be obtained prior to <br /> any site grading. <br /> 11. Utility, grading, and drainage plans must obtain approval from the City Engineer and <br /> Rice Creek Watershed District. <br /> ^ 12. The building design, architectural standards, and signage including the McDonald's <br /> site are subject to review and approval by the Town Center Committee. <br /> 13 <br />