Laserfiche WebLink
COUNCIL MINUTES NOVEMBER 9, 1998 <br /> Consideration of Resolution No. 98 - 163,Final Payment 1998 Seal Coating Program,John <br /> Powell-Mr. Powell stated that the Contractor for the 1998 Sealcoat Project is requesting City <br /> approval of Payment No. 2 (final) in the amount of$2,570.85 and Change Order No. 1. <br /> The project included the sealcoating of various streets throughout the City. The final contract <br /> amounts are summarized as follows: <br /> Original Contract Amount $55,912.50 <br /> Change Order No. 1 $-4,495.54 <br /> Final Contract Amount $51,416.96 <br /> Change Order No. 1 adjusts the final contract amount to reflect a reduction in the material <br /> quantities used on the project. This change was not due to a reduction in the scope of the project. <br /> Instead,a contingency was incorporated into the estimated quantities for the project which was <br /> not used. <br /> Staff recommended Council adopt Resolution No. 98 - 163. <br /> Council Member Neal moved to adopt Resolution No. 98 - 163, as presented. Council Member <br /> Dahl seconded the motion. Motion carried unanimously. <br /> Resolution No. 98 - 163 can be found at the end of these minutes. <br /> Consideration of Resolution No. 98- 164,Metropolitan Council Joint Powers Agreement,I- <br /> 35E,John Powell-Mr. Powell stated the Metropolitan Council is proposing to install a new <br /> gravity trunk sanitary sewer,referred to as the Centerville Interceptor,along Cedar Street some <br /> time within the next two (2)years. This sewer will carry flows from Centerville,Lino Lakes, <br /> and Hugo to the Forest Lake Interceptor. The City's Otter Lake Road Improvements and the <br /> 21 st Avenue Lift Station/Forcemain Improvements will be affected by the proposed sanitary <br /> sewer. <br /> The Otter Lake Road project involves the reconstruction of existing Otter Lake Road from 500 <br /> feet south of Cedar Street to Main Street. Because the City does not want the new roadway <br /> disturbed by the construction of the new sewer,the City has included the installation of a steel <br /> casing pipe at Cedar Street in the Otter Lake Road contract for future use by the Metropolitan <br /> Council. This will allow them to install their sewer across Otter Lake Road without excavating <br /> the new roadway. The proposed Joint Powers Agreement with the Metropolitan Council calls for <br /> them to reimburse the City for the full cost of the casing pipe and an additional 14%for <br /> engineering. <br /> The 21st Avenue Lift Station/Forcemain project involves the installation of a new City sanitary <br /> sewer pumping station near the south leg of Northern Lights Boulevard to be platted as part of <br /> the Clearwater Creek Business Center located on the southwest corner of I-35E and Main Street. <br /> The pumping station will pump the sewage south along proposed 21 st Avenue to Cedar Street <br /> 5 <br />