My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/03/1999 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
1999 Park Board Packets
>
05/03/1999 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 2:56:53 PM
Creation date
7/23/2021 12:34:37 PM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
05/03/1999
Park Bd Meeting Type
Regular
Park Bd Publication Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COUNCIL MINUTES NOVEMBER 9, 1998 <br /> then east along Cedar Street, under I-35E, to an existing City manhole near the Otter Lake <br /> Road/Cedar Street intersection. When the Metropolitan Council installs their new gravity trunk <br /> sewer across the freeway,the City can connect at Cedar Street/21 st Avenue instead of connecting <br /> on the east side of the freeway, eliminating the need for the I-35E crossing. As the Centerville <br /> Interceptor project proposed by the Metropolitan Council will also require a crossing of I-35E, <br /> and as the City will not need the crossing after the Metropolitan Council project is constructed, <br /> the City will propose to install a steel casing pipe across I-35E which can be used by the City and <br /> by the Metropolitan Council for their project. The proposed Joint Powers Agreement calls for <br /> the Metropolitan Council to pay for 90%of the cost of the casing pipe and an additional 14%for <br /> engineering. <br /> The proposed Joint Powers Agreement between the City of Lino Lakes and the Metropolitan <br /> Council is necessary to define responsibilities and conditions between the two (2)agencies. A <br /> summary of the estimated costs to be reimbursed by the Metropolitan Council is as follows: <br /> I-35E Crossing <br /> Item Metropolitan Council Lino Lakes <br /> Construction Cost $35,100 (90%) $3,900 <br /> Design Engineering $ 2,808 (8%) $0 <br /> Construction Observation $2,106(6%) $0 <br /> Subtotal $40,014 $3,900 <br /> Otter Lake Road Crossing <br /> Item Metropolitan Council Lino Lakes <br /> Construction Cost $15,614.10(100%) $0 <br /> Design Engineering $ 1,249.13 (8%) $0 <br /> Construction Observation $ 936.85 (6%) $0 <br /> Subtotal $17,800.00 $0 <br /> Total $57,814.08 $3,900,00 <br /> Mr. Powell noted the City Attorney has reviewed the agreement. Mr. Powell suggested the <br /> agreement state the City will be able to connect to the new gravity trunk sewer west of I-35E. <br /> Staff recommended Council adopt Resolution No. 98 - 164. <br /> Council Member Bergeson moved to adopt Resolution No. 98 - 164, adding the statement that <br /> the City will be able to connect to the new gravity trunk sewer west of I-35E. Council Member <br /> Neal seconded the motion. Motion carried unanimously. <br /> Mr. Powell added that the agreement does have flexibility. Regardless of the bid amounts,the <br /> Metropolitan Council will still pay 90%of the cost of the casing pipe and 14%for engineering. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.