My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/05/1999 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
1999 Park Board Packets
>
04/05/1999 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2021 1:30:35 PM
Creation date
7/23/2021 12:54:13 PM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
04/05/1999
Park Bd Meeting Type
Regular
Park Bd Publication Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
41�ANIS SAINc .CON S T R U C T I O N s <br /> City of Lino Lakes Park Board <br /> 1189 Main Street <br /> Lino Lakes, MN 55014 <br /> Re: Park dedication alternative. 6462 12th Ave. S. Peregrine Pass <br /> In keeping with the new development strategies of the City of Lino Lakes, I <br /> would like to offer to the Park Board an alternate route for the trail system <br /> Typically the trails are placed in the right-of-way easement of the existing <br /> road. I believe that this would harm the overall aesthetics of our proposed <br /> site development, and deprive future trail users of a chance to take a <br /> "walk in the woods". As shown in the drawings, we propose to place the <br /> trail in a corridor of pine trees. This would offer the public a more diverse <br /> atmosphere in which to enjoy the great outdoors, while using the trail <br /> system. The process to complete this plan would mean the removal of <br /> some trees, and a more cautious inlay of the trail itself. This of course <br /> means that there is additional cost involved. <br /> would like to offer the Park Board this alternate trail corridor, fully paved, <br /> in lieu of a cash dedication. The cost of this project essentially equals the <br /> the cost of the park dedication for this property, plus the city would not have <br /> to find the money to pave the trail. <br /> The Park Board consideration of this alternate trail system would be greatly <br /> appreciated, not only by the development, but also by the many future trail <br /> users. <br /> Steven M. Arndorfer <br /> SMA Construction, Inc. <br /> �h <br /> ii11� 2 <br /> 714 E. COUNTY ROAD J. SHOREVIEW, MN 55126 • PHONE/FAx:651-486-6362 <br />
The URL can be used to link to this page
Your browser does not support the video tag.