Laserfiche WebLink
APR-05-1999 09:02 CITY OF LINO LAKES 651 464 4566 P.01/02 <br /> S <br /> M SAIL CON STRU T O N l N, C <br /> Friday, April 02, 1999 <br /> Jeff Smyser,A1CP <br /> City of Lino Lakes <br /> 1199 Main Street <br /> Lino Lakes, MN 55014 <br /> Re: Parks Department- Trail costing,For 6462 12th Ave. <br /> Dear Jeff, <br /> Per your request. I have put together a cost analysis based on real numbers and quantities. <br /> The following are the numbers and cost to put ui a trail through the pine edge of the <br /> Property. Overall trail length is approx. 900 feet. Through this 800 feet we will need to <br /> remove 30 trees+- at a cost of S6000.00. This includes clearing and stumps. We will <br /> remove 2" of topsoil 10 feet wide-50 cu.yds, install 6" of class 5 ten feet wide•-150 cu.yds. <br /> and pave with asphalt an 8 foot wide trail. Soils and asphalt will run S 12,650.00. <br /> This brings the total cost of the trail to S18,650.00. <br /> If you have any questions, please do not hesitate to call. <br /> Respectfully, <br /> Steven M. AmdorFer <br /> SMA Construction, Inc. <br /> 714 E. COUNTY ROAD �. SkOREv]EW. MN 55126 PMONEIFAX:651-486-6362 <br />