My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/22/1995 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1995 Park Board Packets
>
02/22/1995 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2021 12:53:02 PM
Creation date
8/6/2021 10:15:12 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
02/22/1995
Park Bd Meeting Type
Joint
Park Bd Publication Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MUSCOM . <br /> the pledge of quality <br /> Musco takes responsibility for developing sports-lighting <br /> Musco's Light-Structure solutions and backs them with a "satisfaction guaranteed" <br /> Systeafm is covered by an pledge of quality. <br /> unprecedented written 7-year The 7-year, foundation-up Light-Structure warranty <br /> foundation-up warranty. promises that the system is free of defects in materials <br /> Lamps are warranted ac- and workmanship. Luminaire alignment is guaranteed to <br /> cording to published lamp remain accurate for seven years. That means every pos- <br /> manufacturer's guarantee. <br /> sible care is taken during manufacturing and installation to <br /> make sure Musco products give trouble-free performance. <br /> so Factory-built precision <br /> First, each Musco light system is assembled and fac- <br /> tory-aimed according to precise computer models of the <br /> project. Every luminaire assembly is shipped as a modular <br /> photometric unit, factory-aimed to within 1/2 degree <br /> accuracy. You're assured of smooth, uniform lighting on <br /> the playing surface. <br /> Steel crossarms, poles and <br /> electrical enclosures are hot- <br /> d i galvanized <br /> al van zed after <br /> standards n <br /> i J <br /> Short-circuit current and open-circuit voltage Circuit continuity test assures con- <br /> tests ensure proper ballast operation in the tinuous circuit in the factory-wired poletop <br /> factory-wired electrical enclosure. assembly. <br />
The URL can be used to link to this page
Your browser does not support the video tag.