Laserfiche WebLink
• <br /> Wiring connections are completed at the factory to Lamp tests determine <br /> that ensure solid connections. Every component, as well as acceptableht <br /> ranputge.within the <br /> acceptable range. <br /> each complete system, is fully tested before shipment. <br /> �-• Quality checks at every step <br /> Musco quality control technicians check open-circuit <br /> voltage, short-circuit current, high potential dielectric, cir- <br /> cuit continuity, connector load/resistance and grounding <br /> continuity of the poletop assembly and electrical enclo- <br /> sure conductors. You might expect this comprehensive <br /> engineering to be cost prohibitive. But that just isn't so. -•—F <br /> Our manufacturing and testing facilities are dedicated - <br /> to ensuring the performance expectations of all Musco '' � <br /> sports-lighting systems. We share our customer's com- <br /> mitment to projects that are on-time and on-budget. You <br /> have our pledge! --�— <br /> t Sixty foot pole being sub- <br /> jected to structural testing at <br /> 30%above design load. <br /> i <br /> Precision factory-aiming to within 112 degree Solid connections in the factory-built wire <br /> assures on-field accuracy. . . eliminates the harness are assured through connector load/ <br /> need to aim individual fixtures from top of pole. resistance testing. <br />