My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/22/1995 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1995 Park Board Packets
>
02/22/1995 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2021 12:53:02 PM
Creation date
8/6/2021 10:15:12 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
02/22/1995
Park Bd Meeting Type
Joint
Park Bd Publication Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Wiring connections are completed at the factory to Lamp tests determine <br /> that ensure solid connections. Every component, as well as acceptableht <br /> ranputge.within the <br /> acceptable range. <br /> each complete system, is fully tested before shipment. <br /> �-• Quality checks at every step <br /> Musco quality control technicians check open-circuit <br /> voltage, short-circuit current, high potential dielectric, cir- <br /> cuit continuity, connector load/resistance and grounding <br /> continuity of the poletop assembly and electrical enclo- <br /> sure conductors. You might expect this comprehensive <br /> engineering to be cost prohibitive. But that just isn't so. -•—F <br /> Our manufacturing and testing facilities are dedicated - <br /> to ensuring the performance expectations of all Musco '' � <br /> sports-lighting systems. We share our customer's com- <br /> mitment to projects that are on-time and on-budget. You <br /> have our pledge! --�— <br /> t Sixty foot pole being sub- <br /> jected to structural testing at <br /> 30%above design load. <br /> i <br /> Precision factory-aiming to within 112 degree Solid connections in the factory-built wire <br /> assures on-field accuracy. . . eliminates the harness are assured through connector load/ <br /> need to aim individual fixtures from top of pole. resistance testing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.