My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/08/2021 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2021
>
09/08/2021 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2021 4:08:12 PM
Creation date
9/3/2021 11:21:10 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
09/08/2021
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The ACHD Engineering Plan Review process will apply to this site. Drainage <br /> calculations must be submitted along with a grading and erosion control plan that <br /> delineates the drainage areas for this development. The post-developed rate/volume of <br /> runoff must not exceed the pre-developed rate/volume of runoff for the 10-year critical <br /> design storm. Contact Brandon Ulvenes, Engineer I, via phone at 763.324.3159 or via <br /> email at Brandon.UlvenestG7co.anoka.mn.us for further information and to coordinate <br /> the ACHD Engineering Plan Review process. Please submit the drainage calculations, <br /> grading and erosion control plans, ACHD Design Requirements Checklist for County <br /> Highway Modifications(copy available via our website), and the applicable engineering <br /> plan review fee (estimated at $150.00)to Mr. Ulvenes for his review and approval. <br /> Following completion of the ACHD Engineering Plan Review process outlined above, <br /> the contractors) who will be completing any work within the county right of way must <br /> begin the ACHD Permit process. One permit for Work within the County Right of Way <br /> ($150.00) and 4 access permits ($175.00 each) must be obtained prior to the <br /> Commencement of any construction. License permit bonding, methods of construction, <br /> design details, work zone traffic control, restoration requirements and follow-up <br /> inspections are typical elements of the permitting process. Contact Sue Burgmeier via <br /> phone at 763.324.3142 or via email at SUsan.BUrgmeleraco.anoka.mn.us for further <br /> information and to coordinate the ACHD Permit process. <br /> Thank you for the opportunity to comment. Feel free to contact me if you have any <br /> questions regarding this review. <br /> Sincerely, <br /> " " L C ' <br /> Logan Keehr <br /> Traffic Engineering Technician <br /> xc: CSAH 54/Plata-Deveiopments12021 <br /> Jerry Auge,Assistant County Engineer <br /> Jane Rose,Traffic Engineering Manager <br /> David Zieglmeier,County Surveyor <br /> Sean Thiel,Graduate Engineer <br /> Sue Burgmeter,Traffic Engineering Technician <br />
The URL can be used to link to this page
Your browser does not support the video tag.