My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/13/2021 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2021
>
10/13/2021 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2021 10:43:45 AM
Creation date
10/8/2021 4:08:50 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
10/13/2021
P&Z Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Since there is no underlying preliminary plat and development plans for Outlot B, the <br /> outlot will need to be preliminary and final platted in the future. This will be similar to <br /> the development of Main Street Shoppes and Otter Crossing to the west. <br /> Staff Comment: <br /> 1. Rosemary Way street right-of-way shall extend to the west lot line on the <br /> preliminary plat. <br /> 2. Lot 3 shall be shown on the preliminary plat to the west of Lot 2. <br /> 3. Lot 3 shall be final platted as an outlot. <br /> 4. Outlot A contains a publicly maintained stormwater pond and it shall be deeded to <br /> the City after it has been installed, established and approved by the City. <br /> Streets and Alleys <br /> Rosemary Way is a public street aligning with Rosemary Way in the City of Hugo and <br /> extends from 24th Avenue west across the north lot lines of Lots 1-2, Block 1. The public <br /> street is proposed at 32 ft wide paved back to back with 60 ft of street right-of-way. <br /> Additional street right-of-way may be needed in order to accommodate turn lanes and <br /> sidewalk. <br /> Street right-of-way 33.5 ft in width is being dedicated along 24th Avenue creating a full <br /> 66ft of right-of-way. No additional street right-of-way is required along 24th Avenue. <br /> Staff notes Rosemary Way will eventually extend west and connect to Otter Lake Road to <br /> serve future development in both Belland Farms and Main Street Shoppes. This <br /> connection will create an important"backage road" from the City of Hugo and parallel to <br /> CSAH 14/Main Street to support transportation in the area. CSAH 14/Main Street is an <br /> A-Minor Connector road and has limited access points throughout the corridor. <br /> Southbound 24th Avenue access onto CSAH 14/Main Street is right in/right out. <br /> This future street connection is also supported by Lino Lake Public Safety in order to <br /> provide faster and more direct emergency response from CSAH 14 and Otter Lake Road. <br /> This future street connection is further supported by the following City Code Sections: <br /> § 1001.096 LAND REQUIREMENTS. <br /> (2) Proposed subdivisions shall be coordinated with surrounding properties and/or <br /> neighborhoods so that the city as a whole may develop efficiently and harmoniously. <br /> § 1001.100 STREETS AND ALLEYS. <br /> (3) Streets, continuous. Except for cul-de-sacs, streets shall connect with streets <br /> already dedicated in adjoining or adjacent subdivisions or provide for future connections <br /> to adjoining unsubdivided tracts, or shall be a reasonable projection of streets in the <br /> nearest subdivided tracts. The arrangement of thoroughfares and collector streets shall be <br /> considered in their relation to the reasonable circulation of traffic, to topographic <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.