My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/13/2021 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2021
>
10/13/2021 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2021 10:43:45 AM
Creation date
10/8/2021 4:08:50 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
10/13/2021
P&Z Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Belland Farms is consistent with infill policies. The development is within the current <br /> Utility Staging Area IA (2018-2025). The cost of utility and public street extension is <br /> being privately financed by the developer. The cost, operation and maintenance of the <br /> utility system are consistent with the normal costs projected by the water and sanitary <br /> system plans. No future utility costs are proposed. <br /> (c) Roads or highways to serve the subdivision. A proposed subdivision shall meet <br /> the following requirements for level of service (LOS), as defined by the Highway <br /> Capacity Manual: <br /> 1. If the existing level of service (LOS) outside of the proposed subdivision is A or <br /> B, traffic generated by a proposed subdivision will not degrade the level of service <br /> more than one grade; <br /> 2. If the existing LOS outside of the proposed subdivision is C,traffic generated <br /> by a proposed subdivision will not degrade the level of service below C; <br /> 3. If the existing LOS outside of the proposed subdivision is D, traffic generated <br /> by a proposed subdivision will not degrade the level of service below D; <br /> 4. The existing LOS must be D or better for all streets and intersections providing <br /> access to the subdivision. If the existing level of service is E or F, the subdivision <br /> developer must provide, as part of the proposed project, improvements needed to <br /> ensure a level of service D or better; <br /> 5. Existing roads and intersections providing access to the subdivision must have <br /> the structural capacity to accommodate projected traffic from the proposed <br /> subdivision or the developer will pay to correct any structural deficiencies; <br /> 6. The traffic generated from a proposed subdivision shall not require city street <br /> improvements that are inconsistent with the Lino Lakes capital improvement plan. <br /> However, the city may, at its discretion, consider developer-financed improvements <br /> to correct any street deficiencies; <br /> 7. The LOS requirements in divisions (2)(c)l. to 4. above do not apply to the I- <br /> 35W/Lake Drive or I-35E/Main St. interchanges. At city discretion, interchange <br /> impacts must be evaluated in conjunction with Anoka County and the Minnesota <br /> Department of Transportation, and a plan must be prepared to determine <br /> improvements needed to resolve deficiencies. This plan must determine traffic <br /> generated by the subdivision project, how this traffic contributes to the total traffic, <br /> and the time frame of the improvements. The plan also must examine financing <br /> options, including project contribution and cost sharing among other jurisdictions <br /> and other properties that contribute to traffic at the interchange; and <br /> 8. The city does not relinquish any rights of local determination. <br /> Belland Farms meets the requirements for level of service (LOS). The I-35E Corridor <br /> AUAR analyzed traffic impacts for commercial development of this entire corridor. The <br /> proposed medical eye clinic and commercial building is consistent with the AUAR Land <br /> Use Scenarios for commercial development. CSAH 14 (Main Street) is an A Minor <br /> Arterial Connector road and has structural capacity to handle the traffic volume of the <br /> commercial development. No street improvements are proposed that are inconsistent <br /> with the City s capital improvement plan. The city does not relinquish any rights of local <br /> determination. <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.