Laserfiche WebLink
Page 59 of 73 <br /> <br />Design Elements <br />These elements are not relevant currently to the Center, but will be in the future for any expansion <br />or addition. <br /> Potential increase in code space requirements concerning deck, changing rooms, locker <br />rooms and other common spaces based on lower user capacities/square meter. <br /> Increased design and cost for increased separation or partitioning in common areas, <br />particularly locker rooms, changing areas, and restrooms <br /> Incorporate more robust and higher capacity HVAC and dehumidification systems <br />o See operational note above <br />o Potentially include new UV and Bipolar Ionization air purification systems <br />o In July he ASHRE (the American Society of Heating, Refrigerating and Air <br />Conditioning Engineers) Epidemic Task Force has issued new air purification and <br />HVAC safety recommendations to address the current and minimize future <br />contagious illness and pathogen circulation in indoor air systems <br /> New products for facility safety and cleanliness are already coming to market. It will be <br />important to continue to be award of new technologies relevant to existing and new aquatic, <br />sport, and recreational facilities. <br /> <br />Renovation <br />Renovation considerations are relevant to the Center as systems replacement or other renovation <br />take place over the next several years. <br /> Consider upgrading pool water mechanical systems at existing pools earlier than dictated by <br />projected life expectancy <br />o Added advantage of achieving operational cost savings and increased efficiency in <br />addition to the higher levels of water quality and cleanliness <br />o Relevant to the BAC/Odle analysis and renovation plan <br /> Review current HVAC system to identify potential upgrades and inclusion of air purification <br />systems <br /> When reviewing potential renovation of locker rooms, changing rooms, and common lobby <br />space take spacing and partitions into account based on the latest recommendations at the <br />time of renovation <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />