My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-14-2021 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2021
>
Searchable Packets
>
06-14-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2021 10:53:20 AM
Creation date
11/4/2021 9:07:51 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/14/2021
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Lake Drive (from 77th Street to approximately 7600 Peltier Lake Drive), Cedar Street <br />(from 20th Avenue to east where pavement ends), Sherman Lake Road (from Birch Street <br />to approximately 6725 Sherman Lake Road and from Timberwolf Trail to Pondview <br />Circle), Sherman Lake Court, Merganser Court, Pheasant Hills Drive, Broken Oak Court, <br />Pheasant Hills Circle, Snow Goose Trail, Hawk Ridge Circle, Timberwolf Trail (from <br />Birch Street to Sherman Lake Road), Timberwolf Court, Holly Drive (from Cripple Creek <br />Pass to 12th Avenue), White Oak Road, Chokecherry Road, Whitetail Trail, Buckthorn <br />Lane, Velvetleaf Lane, Fire Station Road (1710 Birch St, from Centerville Road to Birch <br />Street). <br /> <br />Bids were received on Tuesday, June 8, 2021. A total of 1 bid was received. As shown below: <br /> <br />CONTRACTOR TOTAL BASE BID TOTAL BASE BID <br />+ ALT 1 <br />Corrective Asphalt Materials, LLC $194,786.59 $212,037.07 <br /> <br />The low bid was submitted by Corrective Asphalt Materials, LLC in the amount of <br />$212,037.07 for the base bid and the bid alternate. Alternate 1 in the amount of $17,250.48 is <br />within the available budget and is being recommended for award. <br /> <br />The budget for the project, including soft costs, contingencies and engineering construction <br />services, is $244,300. This project is within the budget planned for 2021. The project is <br />funded through the Pavement Management fund which includes development fees collected for <br />the applicable roadways. <br /> <br />The completion date for this project is October 22, 2021. <br /> <br />RECOMMENDATION <br /> <br />Staff recommends adoption of Resolution No. 21-57, Accepting the Bid and Awarding a <br />Construction Contract for the 2021 Street Maintenance Project in the amount of $212,037.07 to <br />Corrective Asphalt Materials, LLC. <br /> <br />ATTACHMENTS <br /> <br />1. Resolution 21-57 <br />2. Project Map <br />3. Bid Tabulation <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.