My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-28-2021 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2021
>
Searchable Packets
>
06-28-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2021 10:53:20 AM
Creation date
11/4/2021 9:08:08 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/28/2021
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE AID FOR LOCAL TRANSPORTATION Rev. February 2018 <br /> CHANGE ORDER Page 1 of 2 <br /> <br />SP/SAP S.A.P. 210-103-003 Minn. Project No. Change Order No. 1 <br />Project Location: 2021 Street Improvement Projects <br />Local Agency: City of Lino Lakes Local Project No. <br />Contractor: T. A. Schifsky & Sons, Inc. Contract No. 017006-000 <br />Contractor Address: 2370 East Hwy. 36 North St. Paul, MN 55109 <br />Total Change Order Amount: $248,215.42 <br />Description: <br /> <br />In accordance with the terms of this Contract, you are herby authorized and instructed to perform the work as altered by the <br />following provisions. <br /> <br />The Engineer in concurrence with the City of Lino lakes, have agreed that all of the water service saddles need replacing due to <br />the deteriorated conditions of the materials. Due to this work, the pavement reclamation will now be stockpiled onsite in the cul- <br />de-sacs to avoid contamination from the underneath soil that will be piled up during watermain work. It has also been decided <br />that increasing the aggregate base section to 7.5" is favorable to help prolong the life expectancy of the roadway. Excavatio n of <br />3"-5" to the existing sand section is now necessary to accommodate the new increased aggregate base section. Included in the <br />work, the Contractor shall provide 1400 CY of reclaim material to the Tower Park location. <br /> <br />The Engineer in concurrence with the City of Lino lakes, have agreed that adding in two 6" gate valves is necessary to help <br />control watermain shut down areas. <br /> <br />This work will be considered "Contract Revisions" as provided for Specification 1402. Payment for this work will be a contrac t <br />prices and negotiated prices. <br /> <br />Estimate Of Cost: (Include any increases or decreases in contract items, any negotiated or force account items.) <br />Group/Funding <br />Category** Item No. Description Unit Unit Price + or – <br />Quantity <br />+ or – <br />Amount $ <br />Local 2021.501 MOBILIZATION LS $7,500.00 1 $7,500.00 <br />Local 2215.507 HAUL FULL DEPTH RECLAMATION <br />(LV) C Y $18.00 5349 $96,282.00 <br />Local 2504.602 6" GATE VALVE & BOX EACH $5,083.49 2 $10,166.98 <br />Local 2504.602 INSTALL WATER SERVICE SYSTEM EACH $3,051.51 44 $134,266.44 <br />Net Change This Change Order $248,215.42 <br />*Includes Prime Contractor 10% Markup <br />**Group/funding category is required for federal aid projects <br />Due to this change, the contract time: (check one) <br />( X ) Is NOT changed ( ) May be revised as provided in MnDOT Specification 1806 <br />Number of Working Days Affected by this Contract Change: <br /> <br />Number of Calendar Days Affected by this Contract Change: <br /> <br /> <br />Approved By Project Engineer: Date: <br /> <br />Print Name: Phone: <br /> <br />Approved By Lino Lakes: Date: <br /> <br />Print Name: Phone: <br /> <br />Approved By Contractor: Date: <br /> <br />Print Name: Phone:
The URL can be used to link to this page
Your browser does not support the video tag.