Laserfiche WebLink
<br />4 <br /> <br />a. If the existing level of service (LOS) outside of the proposed subdivision is A <br />or B, traffic generated by a proposed subdivision will not degrade the level of <br />service more than one grade. <br /> <br />b. If the existing LOS outside of the proposed subdivision is C, traffic generated <br />by a proposed subdivision will not degrade the level of service below C. <br /> <br />c. If the existing LOS outside of the proposed subdivision is D, traffic generated <br />by a proposed subdivision will not degrade the level of service below D. <br /> <br />d. The existing LOS must be D or better for all streets and intersections <br />providing access to the subdivision. If the existing level of service is E or F, <br />the subdivision developer must provide, as part of the proposed project, <br />improvements needed to ensure a level of service D or better. <br /> <br />e. Existing roads and intersections providing access to the subdivision must have <br />the structural capacity to accommodate projected traffic from the proposed <br />subdivision or the developer will pay to correct any structural deficiencies. <br /> <br />f. The traffic generated from a proposed subdivision shall not require City street <br />improvements that are inconsistent with the Lino Lakes Capital Improvement <br />Plan. However, the City may, at its discretion, consider developer-financed <br />improvements to correct any street deficiencies. <br /> <br />g. The LOS requirements in paragraphs a. to d. above do not apply to the I- <br />35W/Lake Drive or I-35E/Main St. interchanges. At City discretion, <br />interchange impacts must be evaluated in conjunction with Anoka County and <br />the Minnesota Dept. of Transportation, and a plan must be prepared to <br />determine improvements needed to resolve deficiencies. This plan must <br />determine traffic generated by the subdivision project, how this traffic <br />contributes to the total traffic, and the time frame of the improvements. The <br />plan also must examine financing options, including project contribution and <br />cost sharing among other jurisdictions and other properties that contribute to <br />traffic at the interchange. <br /> <br />h. The City does not relinquish any rights of local determination. <br /> <br />Pine Street is a major collector road. The existing road has structural design and <br />capacity to accommodate traffic proposed by the commercial stables. <br /> <br />5. The proposed development shall be served with adequate and safe water supply. <br /> <br />The Property is served by a private well that can serve the commercial stables. <br /> <br />6. The proposed development shall be served with an adequate and safe sanitary sewer <br />system. <br />