My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07-26-2021 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2021
>
Searchable Packets
>
07-26-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2021 11:21:35 AM
Creation date
11/4/2021 11:08:40 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/26/2021
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lyngblomsten at Lino Lakes Addition <br />Development Agreement <br />July 26, 2021 <br /> page 5 <br />8. City Improvements. No City improvements are proposed to be constructed for this <br />subdivision. <br />9. Record Drawings. <br />a. Upon project completion, Developer shall submit record drawings, in electronic <br />format, of all public and private infrastructure improvements, including grading, <br />sanitary sewer, watermain, storm sewer facilities, and roads, constructed by <br />Developer. The files shall be drawn in Anoka County NAD 83 Coordinate system <br />and provided in both AutoCAD .dwg and Adobe .pdf file formats. The plans shall <br />include accurate locations, dimensions, elevations, grades, slopes and all other <br />pertinent information concerning the complete work. <br />b. The Developer shall submit certified compaction testing results for the site <br />grading operations. <br />c. A summary of the record plan attribute data for the storm sewer, watermain, <br />and sanitary sewer structures and pipes shall be submitted in the form of an <br />Excel Spreadsheet as provided by the City Engineer. <br />d. No securities will be fully released until all record drawings have been submitted <br />and accepted by the City Engineer. <br />10. Faithful Performance of Construction Contracts and Security. <br />a. The Developer will fully and faithfully comply with all terms and conditions of any <br />and all contracts entered into by the Developer for the installation and construction <br />of all Developer Improvements. Concurrent with the execution hereof by the <br />Developer, the Developer will furnish to, and at all times thereafter maintain with <br />the City, a cash deposit, certified check, Irrevocable Letter of Credit, or Surety <br />Agreement in form and substance as set forth on Exhibit D attached hereto (at <br />Developer’s sole option), based on one hundred and twenty-five (125%) percent of <br />the total estimated cost of the Developer's Improvements as set forth on Exhibit C <br />attached hereto. <br />As set forth on Exhibit C, any other Developer work not secured by the cash deposit, <br />certified check, Irrevocable Letter of Credit, or Surety Agreement required under this <br />paragraph 10 for Developer Improvements, including but not limited to parking lot <br />construction, shall be covered by a separate security posted by the Developer of not <br />less than thirty-five (35%) percent of the total estimated cost of such work. <br />b. Irrevocable Letter of Credit. If an Irrevocable Letter of Credit is utilized for any <br />security required by this Agreement, it shall be for the exclusive use and benefit of <br />the City of Lino Lakes and shall state that it is issued to guarantee and assure
The URL can be used to link to this page
Your browser does not support the video tag.