My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03-09-2020 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
03-09-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2021 12:10:57 PM
Creation date
11/17/2021 11:22:53 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
03/09/2020
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Rick DeGardner <br />March 4, 2020 <br />Page 2 <br /> <br />3. Water Treatment Options <br /> <br />Upon completion of the source water analysis, we will explore available water treatment <br />options and the recommending preferred processes for treating known and emerging <br />contaminants that will potentially need to be treated over the anticipated life of the water <br />treatment plant(s). The report will examine available treatment process options for <br />identified contaminants potentially needing treatment, recommend a preferred treatment <br />process for each identified contaminant, identify required space needs for preferred <br />treatment processes, provide recommendation as to the required size and preferred <br />location for the facility, and provide cost estimates for constructing and operating the <br />facility. We will study both conventional and biological filtration and present their benefits. <br /> <br />The iron, manganese, and ammonia in the City’s water could be treated without chlorine <br />and potassium permanganate with biological filtration. Biological filtration is commonly <br />practiced in the United States and Europe and is endorsed by the Minnesota Department <br />of Health (MDH) as an efficient and effective method for treating these (and other) <br />contaminants. The benefits of biological filtration include higher filtration rates, longer <br />filter runs (reduces backwash supply and wastewater volumes), savings in chemical <br />costs, and reduction in disinfection byproducts. The design of a conventional gravity <br />filtration process with detention and aeration can easily be modified to accommodate <br />biological filtration after the successful completion of a biological filtration study as <br />required by MDH. <br /> <br />WSB will coordinate and attend tours of existing water treatment facilities that utilize each <br />of the treatment methods being evaluated so that City staff have a clear understanding of <br />the treatment technologies and options that are available for the water treatment plant. <br />The analysis will include, but not be limited to, initial construction costs, long term <br />operational costs, the ability of each system to effectively and efficiently remove iron, <br />manganese, ammonia, and other contaminants from the water supply, the discharge of <br />the waste product, and the ability of the plant to be expanded or be modified in the future. <br />This will be a comprehensive review and recommendation on the “best” plant to meet the <br />current and future needs of the City. <br /> <br />4. Review Existing Site <br /> <br />A potential site for the proposed water treatment plant has been identified at the <br />southwest intersection of Birch Street and 12th Avenue South. The WSB team will visit <br />the proposed water treatment plant site and review the existing wetlands in the area. We <br />will also review the as-built drawings, easements, and existing infrastructure to determine <br />if the site is feasible for further consideration for the water treatment plant. Potential <br />contaminants and other barriers that may restrict or affect the layout of the plant at the <br />site will be evaluated up front during this analysis. Other factors such as ease of chemical <br />deliveries, access for maintenance trucks, security, stormwater retention, proximity to <br />water and sanitary sewer utilities, proximity to three phase-480 volt electrical power, <br />proximity to existing and future wells, and the potential for the City to acquire the property <br />will be evaluated during the preliminary design phase. <br /> <br />5. Centralized Water Treatment Plant Preliminary Drawing <br /> <br />We will design and create a footprint for a gravity filtration water treatment plant that will <br />be superimposed onto a conceptual site plan drawing at the southwest intersection of <br />Birch Street and 12th Avenue South. The water treatment plant footprint will show the <br />exterior dimensions of the plant and not show internal rooms or room dimensions. The
The URL can be used to link to this page
Your browser does not support the video tag.