Mr. Rick DeGardner <br />March 4, 2020 <br />Page 3 <br /> <br />conceptual site plan will also show space for a future water treatment plant expansion <br />footprint. <br /> <br />6. Water Distribution System Modeling and Watermain Phasing Plan <br /> <br />Preliminary water distribution system modeling has indicated that a centralized water <br />treatment plant could initially treat Wells 1, 3, 5, and 6, and without upsizing the existing <br />16-inch watermain on Birch Street. The City’s maximum day water demands will <br />eventually exceed the hydraulic capacity of the existing 16-inch watermain on Birch <br />Street. If Wells 2 and 4 are left untreated and used only as peaking wells on maximum <br />day demands, the existing 16-inch watermain should have adequate hydraulic capacity to <br />convey treated water from a centralized water treatment plant for the next 10 to 15 years <br />based on the water demand projections in the City’s Comprehensive Plan. At that time, a <br />parallel 16-inch watermain will need to be constructed along Birch Street and extended <br />westward and eastward in phases as the capacity of the water treatment plant is <br />increased and possibly expanded in the future with new wells pumping to the plant. <br />Constructing a future plant expansion and a parallel 16-inch watermain in phases along <br />Birch Street will be evaluated as part of this study. The raw watermain costs to be <br />constructed from the City’s existing wells to the centralized water treatment plant will also <br />be figured-in to the estimated costs. <br /> <br />7. Study Neighborhood Impacts <br /> <br />The preliminary design report will explore potential impacts of the water treatment facility <br />on neighboring properties due to noise, odors, operating hours, traffic, and other <br />identified sources of impact and recommend a process for mitigating any identified <br />impacts during the final design process. Neighborhood meetings are not anticipated for <br />this study phase and not included in this proposal. <br /> <br />8. Determine Estimated Costs <br /> <br />The preliminary design report will include estimated construction and operating costs for <br />a groundwater treatment facility. Estimated costs will assume industry standard costs for <br />a gravity filtration water treatment plant. The report will explore and recommend “order of <br />magnitude” water rate revisions needed to offset future budget impacts to fund the water <br />treatment plant. This analysis does not replace a water rate study that should also be <br />completed under a separate project. <br /> <br />9. Report Preparation <br /> <br />The findings, estimated costs, and recommendations from the study will be summarized <br />in a report along with report figures and presented to the City Council. <br /> <br />10. Meetings <br /> <br />We will coordinate, prepare handouts, and attend up to three (3) meetings with City staff <br />and three (3) City Council meeting to discuss the report. <br /> <br />