My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04-06-2020 Council work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
04-06-2020 Council work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2021 12:29:26 PM
Creation date
11/17/2021 11:24:02 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/06/2020
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 2 <br />made hereafter to the design as presented in the Exhibit “A” Layout will require approval by the parties <br />as an amendment to this JPA. These same changes will require a change in the cost share to include any <br />additional design engineering costs that may occur. <br /> <br />II. METHOD <br /> <br /> The County shall cause the construction of Anoka County Project SAP 002-634-003, City project <br />number SAP XXX-XXX-XXX, in conformance with proposed engineering plans and specifications. <br /> <br />IMPROVEMENTS <br /> <br />It is agreed by the parties that in 2021, CSAH 34 will be reconstructed with concrete median to the <br />extent shown in ‘Exhibit A’. Improvements include but are not limited to: roadway widening, <br />roundabout construction, storm sewer and associated ponding, turn lanes, shoulders, bituminous trails, <br />retaining walls/fencing and concrete curb & gutter. The costs of these improvements have been <br />estimated for this agreement and will be finalized after bids have been received. These costs will be <br />shared by the County and the City. <br /> <br />INTERSECTIONS: <br /> <br />As agreed by the parties, improvements to the following intersections have been incorporated in the <br />‘Exhibit A’ Layout design: <br /> <br />CSAH 34 @ Hokah Drive: Full Access <br />CSAH 34 @ Totem Trail: ¾ Access <br />CSAH 34 @ Tomahawk Trail: Roundabout – Full Access <br />CSAH 34 @ West Rice Lake Elementary School Entrance: Closed (relocated to Roundabout) <br />CSAH 34 @ East Rice Lake Elementary School Entrance: Right-in/Right-out Access <br />CSAH 34 @ Vaughan Court: Right-in/Right-out Access <br />CSAH 34 @ West Shadow Lake Drive: Roundabout – Full Access <br />CSAH 34 @ Kingfisher Court: Full Access <br /> <br />RIGHT OF WAY: <br /> <br />The parties agree that the County will acquire all necessary right-of-way and easements for the Project. <br />Acquisition of any additional right-of-way and/or easements needed for improvements to city street <br />intersections beyond what is defined in the ‘Exhibit A’ Layout will be the responsibility of the City. It is <br />agreed by the parties that all necessary right of way and easements will be in legal possession of the <br />County prior to acceptance of bids for the project. The County will work with the City to facilitate any <br />land transfer necessary to complete the project and provide for proposed City Well location. <br /> <br />DRAINAGE: <br /> <br />The City shall pay for a percentage of the cost of the storm sewer system, including the detension basins <br />and their outlet structures. The City portion of the cost is based on contributing flow through the storm <br />sewer system determined by the product of contributing area and runoff coefficient. <br /> <br />TRAFFIC CONTROL: <br />
The URL can be used to link to this page
Your browser does not support the video tag.