My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04-06-2020 Council work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
04-06-2020 Council work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2021 12:29:26 PM
Creation date
11/17/2021 11:24:02 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/06/2020
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 3 <br />The parties agree and understand the cost share for traffic control for the city shall be a prorated share <br />based on the City project cost divided by the total project cost. <br /> <br />The parties understand and agree that CSAH 34 will be open thru traffic during most phases of <br />construction. During certain phases of construction CSAH 34 will be open to one-way traffic, while the <br />opposing traffic will be detoured through CSAH 49, Ash Street, CR J, CSAH 32 and CSAH 21.When <br />necessary, CSAH 34 will be closed to through traffic and detoured through CSAH 49, Ash Street, CR J, <br />CSAH 32 and CSAH 21. Closures will be limited to weekends. Access for local and emergency <br />vechicles will be maintained during all phases of construction. <br /> <br />DRIVEWAYS: <br /> <br />The parties agree that all driveways affected by the Project will be reconstructed in kind at 100% project <br />cost with the cost of any upgrades requested by the City, including concrete aprons, to be the sole <br />responsibility of the City. <br /> <br />LANDSCAPING/STREETSCAPING: <br /> <br />The parties agree that if the City wishes to include landscaping or streetscape features in the project, they <br />shall be designed in accordance with Anoka County Highway Department Landscape/Streetscape <br />Guidelines. The City shall supply the signed plan sheets and specifications for the proposed <br />landscape/streetscape. The total cost of the design as well as the construction cost above standard cost <br />will be at the expense of the City. All construction documents must be submitted to the County by May <br />20, 2020. Maintenance of any landscaping/streetscaping will be the sole responsibility of the City. <br /> <br />RETAINING WALLS: <br /> <br />The parties agree that if the City wishes to include aesthetic treatment to any retaining walls, any <br />construction cost above standard cost will be at the expense of the requesting City <br /> <br />LIGHTING: <br /> <br />The parties agree that the roundabout intersection lighting costs will be shared per the standard County <br />cost share for new traffic signals, with the City paying for 75% of the roundabout lighting. If the City <br />would like additional lighting on the project, or requests upgraded lighting materials (e.g. decorative <br />poles, fixtures, and luminaires), this additional cost would be 100% City responsibility. Lighting will be <br />installed in accordance with the City lighting ordinance and will contain LED fixtures wherever possible <br />and provided such lighting is within the budget for the Project. <br /> <br />UTILITIES: <br /> <br />The parties agree that the ‘Exhibit A’ Layout does not include specific proposed utility locations. The <br />City will be responsible for the design of any sanitary sewer and water main improvements and/or <br />relocations due to road reconstruction, which will be incorporated into the project bid documents. The <br />cost of the design, construction, and inspection of these features shall be the responsibility of the City. <br />The City’s design of the sanitary sewer and water main utilities are to include signed plans, <br />specifications, and estimated quantities (using MnDOT Trns*port Item List Numbers) and cost. All <br />construction documents must be submitted to the County by May 20, 2020. <br />
The URL can be used to link to this page
Your browser does not support the video tag.