Laserfiche WebLink
<br />The low quote was submitted by GM Contracting, Inc. of Lake Crystal, Minnesota, in the <br />amount of $150,421.21. The overall project budget includes a contingency for add on items to <br />address field conditions for dewatering and pot holing to locate existing utilities. The overall <br />project construction budget is $175,000.00. Funding for the project is from the Water Operating <br />Fund. <br /> <br />The start date for this project, which is as soon as possible, is the week of May 11, 2020. The <br />restoration work for the project will completed through a separate bid and will be combined with <br />the work needed on Snow Goose Circle. <br /> <br />Staff is working on a cost effective long term plan to address the condition of City’s watermain in <br />certain neighborhoods where public works has seen evidence of corrosion. Currently, we are <br />evaluating the water systems with our street rehabilitation projects. <br /> <br />RECOMMENDATION <br /> <br />Staff recommends adoption of Resolution No. 20-42 accepting quotes and awarding a construction <br />contract for the Lift Station No. 5 Forcemain Repair Project, in the amount of $150,421.21 to GM <br />Contracting, Inc. <br /> <br />ATTACHMENTS <br /> <br />1. Resolution No. 20-42 <br />2. Location Map <br />3. Pictures