My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04-27-2020 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
04-27-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2021 12:29:26 PM
Creation date
11/17/2021 11:24:48 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/27/2020
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEGEND:(SEE SPECIFICATION - SHEET 2)DENOTES CRACKFILL AND FOG SEAL AREADENOTES BIOROLLBRBR <br />BRBRBRBRBRBRBRBR189918918918189229229 <br />2259919 <br />19 919 9CITY HALLCRACK FILL,FOG SEAL ANDSTRIPING PLANK:\015071-000\Cad\Plan\015071-000 C-CONS-QUOTE PLAN.dwg 4/2/2020 7:51:54 AM SCALE IN FEET0H:3060NTOWN CENTER PARKWAYWSB PROJECT NO.:REVISIONS <br />NO.DATE DESCRIPTION <br />015071-000SCALE:PLAN BY:DESIGN BY:CHECK BY:AS SHOWNSHEETOFEYEYKGI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, <br />OR REPORT WAS PREPARED BY ME OR UNDER MY <br />DIRECT SUPERVISION AND THAT I AM A DULY <br />LICENSED PROFESSIONAL ENGINEER UNDER THE <br />LAWS OF THE STATE OF MINNESOTA. <br />LIC. NO:DATE: <br />DIANE L. HANKEE, PE <br />03/23/2020 43338 <br />2020 CITY HALL PARKING <br />LOT FOG SEAL PROJECT <br />CITY OF LINO LAKES44A.ACCESS TO DRIVEWAYS MUST BE MAINTAINED AT ALL TIMES.B.PROTECT ALL EXISTING UTILITIES, CURB AND GUTTER, DRIVEWAYS AND LANDSCAPING.C.ALL STREETS IN AND ADJACENT TO THE PROJECT SHALL REMAIN CLEAN AND PASSABLE AT ALL TIMES. ANYSEDIMENT OR DEBRIS SHALL BE REMOVED WITHIN 24 HOURS, OR AS OFTEN AS NEEDED TO ENSURE PUBLICSAFETY AND ACCESS.D.TRAFFIC CONTROL CONSIDERED INCIDENTAL TO FOG SEAL AND STRIPING.E.CITY HALL FOG SEAL AND /OR STRIPING CANNOT BE APPLIED ON AUGUST 11, 2020 DUE TO CITY EVENT. ***F.CONTRACTOR TO COORDINATE SCHEDULE WITH LINO LAKES POLICE DEPARTMENT.CONSTRUCTION NOTES4" SOLID LINE WHITE (PAINT)INTERNATIONAL SYMBOL FORACCESSIBILITY (3) - SEE DETAILSHEET 3INTERNATIONAL SYMBOL FORACCESSIBILITY (2) - SEE DETAILSHEET 3TEMPORARY POLICEPARKING4" SOLID LINE WHITE (PAINT)4" SOLID LINE WHITE (PAINT)4" SOLID LINE WHITE (PAINT)4" SOLID LINE WHITE (PAINT)4" SOLID LINE WHITE (PAINT)4" SOLID LINE WHITE (PAINT)1 04/01/20 STRIPING MATERIAL - PAINT
The URL can be used to link to this page
Your browser does not support the video tag.