My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-04-2020 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
05-04-2020 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2021 1:57:27 PM
Creation date
11/17/2021 11:25:17 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/04/2020
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />4/13/2020 <br />Page 4 <br />Nadeau Acres Engineering Review <br /> <br /> <br />Storm adjusted further back. Note that 20 feet from overhead power is not possible given the <br />maintenance access location and the need to revise a storm manhole to a catch basin manhole for <br />drainage purposes. <br />We are still concerned that the storm sewer is too close to the proposed structures for Lots 6 & 7 of <br />Block 2. <br />5. The north arrow is incorrect and wetlands on the figures should be labeled or noted in the legends <br />on Stormwater Management Plan Figures 2 and 3 and Storm Sewer Catchment Figure 4. <br />North arrow revised. Wetland line added to legend. <br />6. Show Proposed HydroCAD Pond “CB50” on Figure 3. <br />CB50 added. <br />7. Proposed HydroCAD Pond P300 stage storage invert (911.0) does not match bottom contour <br />shown on grading plan. (914) <br />HydroCAD model updated to match grading plan. <br />8. Ponds modeled in HydroCAD for backyard drainage swales and depressions (P300, P30A, P30B, and <br />CB50) should be modeled as a catch basin in HydroCAD (“pond with insignificant storage”). If they are <br />modeled as ponds, they will need to be evaluated to meet freeboard requirements for detention basins <br />(2’ of freeboard from the low entry in the 100-year storm event). <br />Revised to ponds with insignificant storage. Note that CB 122/123 was modeled as ponds to <br />determine by-pass flow (if any) to see if these would be directed towards a different pond/wetland or <br />offsite. <br />9. Plunge Pool Energy Dissipator grading requires revision. The bottom of the plunge pool grading of <br />891.5 has no width in the middle of it and grading is not feasible. Recommend at least 4-feet bottom <br />width to avoid erosion of slopes of pool. Confirm riprap size used at riprap check and overflow. <br />Recommend a detail or notes regarding width and depth of riprap check and overflow, and note on <br />how riprap size was determined. <br />10. Drainage Area S-10 is shown to flow to W-10. S-10 includes area east of Lots 12-20 of Block 4. <br />Confirm the drainage path for flow to pass from south to north under proposed Red Oak Lane. <br />11. Roadway profile and storm sewer – the road profile shall be a minimum of 1% grade. Adjust road <br />profile grade to move low points from intersections, Josephine and Red Oak. Storm sewer roadway <br />catch basins are spaced too far apart, 350 ft min. please extend storm sewer and add catch basins. <br />12. For the downstream ditches / outlets please provide a baseline data report <br />- Survey the bottom of the ditches. <br />- Provide a ditch cross section every 200’ or where it is observed to have a change in section. <br />- Shoot culverts and provide information on type, elevation and condition, document % full of water. <br /> <br />• Water Supply <br />There is existing 16-inch diameter ductile iron pipe (DIP) watermain along 20th Av enue (CSAH 54) east <br />of the site and along Birch Street (CSAH 34) south of the site. <br /> <br />The City of Lino Lakes Comprehensive Plan does not designate any trunk watermain going through this <br />site. This has been revised with the latest water system plan. <br /> <br />The applicant is proposing an 8-inch diameter DIP watermain to serve the entire development. The <br />watermain will extend and loop from the east (North Pointe) along Red Oak Lane and from the south <br />(Birch Street). <br /> <br />Comments: <br />1. The watermain along Red Oak Lane shall be 12-inch diameter DIP. Trunk watermain credits will <br />apply. <br />Revised. <br />This is to be updated to a 16 inch DIP trunk watermain along Red Oak and Josephine. Trunk <br />water credits will apply. <br />2. A hydrant shall be installed by the lift station at the north end of Heritage Avenue. <br />Revised. Note that hydrant elevation may need to be revised when Heritage Avenue extends to the <br />north. <br />Please put a temporary hydrant at the north end of Heritage Avenue. <br />3. Applicant shall add a temporary hydrant at the dead end of Red Oak Lane. <br />Revised. Temporary hydrants added to site plans. <br />4. The City of Lino Lakes should consider installing water service stubs to serve the possible <br />future development at 6687 20th Avenue (26-31-22-14-002). It is anticipated that this parcel will develop into five lots that have access off of Red Oak Lane.
The URL can be used to link to this page
Your browser does not support the video tag.