My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-11-2020 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
05-11-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2021 1:57:27 PM
Creation date
11/17/2021 11:29:32 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/11/2020
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 Mitigation Plan Update – 2020 January 31, 2020 <br /> <br />Item No. Mitigation Description Update <br />21.2.3 Work with appropriate road authorities to construct Northerly <br />Bypass with new interchanges at I-35W and I-35E (80th Street East) to <br />improve traffic operations and access to and within the AUAR area. As <br />recommended by FHWA and Mn/DOT, a phasing plan should be <br />established to construct each piece of the Northerly Connector as it <br />becomes necessary to maintain the serviceability of the transportation <br />system. <br /> <br />Phase Improvement <br />1. CSAH 14, I-35W to I-35E (funded and <br />programmed for construction) <br />2. CSAH 14, I-35E Interchange <br />3. CR 140 (80th Street)/I-35E Interchange <br />4. CSAH 14 across Peltier Lake (Northerly <br />Bypass/Connector) <br />5. CSAH 14/I-35W Interchange <br /> <br />As part of these improvements, the following steps should be taken as the <br />opportunity is presented: <br /> <br />• Inclusion of the northerly bypass and proposed interchanges in <br />future transportation and comprehensive plans <br />• Preservation of right of way through official mapping or other <br />process <br />• Right of way dedication through the platting process <br />21.3 <br /> <br />Require a traffic impact analysis for all development projects within the <br />AUAR area. The traffic impact analysis will assist the City and other road <br />authorities in determining the appropriate mitigation measures that are <br />required to mitigate impacts of a specific development proposal. <br />This mitigation measure is ongoing.
The URL can be used to link to this page
Your browser does not support the video tag.