Laserfiche WebLink
2019 2020 <br />Year to Estimated Estimated <br />Department Replace <br />City of Sample, Minnesota <br />Capital Improvement Plan - Storm Drainage Fund 515 <br />Schedule of Planned Capital Outlay 2018 to 2030 <br />Item Cost Amounts Amounts <br />Storm water 2018 Dredge Basset Creek Park pond 1,000,000$ -$ -$ <br />Storm water 0094.6935 0059 2019 Becker Park infiltration project (1)2,432,985 2,432,985 - <br />Storm water 0094.6935 TBA 2020 City storm water model and flood analysis 125,000 - 125,000 <br />Storm water 0094.6935 TBA 2020 Rate Control,water quality, structure Rehab projects 50,000 - 50,000 <br />Storm water 0094.6935 TBA 2020 W. Broadway and Kentucky Infiltration 150,000 - 150,000 <br />Storm water 0094.6935 TBA 2020 Utility Reconstruction 50,000 - 50,000 <br />Storm water 0094.6935 TBA 2021 6804 - Gaulke Pond design, dredging, lift station rehab 800,000 - - <br />Storm water 0094.6935 TBA 2021 Rate Control,water quality, structure Rehab projects 50,000 - - <br />Storm water 0094.6935 TBA 2021 Utility Reconstruction 50,000 - - <br />Storm water 0094.6935 TBA 2022 Brownwood pond dredging and expansion 750,000 - - <br />Storm water 0094.6935 TBA 2022 Saving for flood control structure replacement 200,000 - - <br />Storm water 0094.6935 TBA 2022 Utility Reconstruction 50,000 - - <br />Storm water 0094.6935 TBA 2023 Rate Control,water quality, structure Rehab projects 50,000 - - <br />Storm water 0094.6935 TBA 2023 Saving for flood control structure replacement 200,000 - - <br />Storm water 0094.6935 TBA 2023 Equipment Replacement 20,000 - - <br />Storm water 0094.6935 TBA 2023 Utility Reconstruction 50,000 - - <br />Storm water 0094.6935 TBA 2024 Rate Control,water quality, structure Rehab projects 100,000 - - <br />Storm water 0094.6935 TBA 2024 Saving for flood control structure replacement 200,000 - - <br />Storm water 0094.6935 TBA 2024 Utility Reconstruction 50,000 - - <br />Storm water 0094.6935 TBA 2025 Equipment Replacement 20,000 - - <br />Storm water 0094.6935 TBA 2025 Rate Control,water quality, structure Rehab projects 100,000 - - <br />Storm water 0094.6935 TBA 2025 Saving for flood control structure replacement 200,000 - - <br />Storm water 0094.6935 TBA 2025 Utility Reconstruction 50,000 - - <br />Storm water 0094.6935 TBA 2026 Bassett Creek Park Streambank Stablization and 29th culvert replacement (3)1,000,000 - - <br />Storm water 0094.6935 TBA 2026 Rate Control,water quality, structure Rehab projects 100,000 - - <br />Storm water 0094.6935 TBA 2026 Saving for flood control structure replacement 200,000 - - <br />Storm water 0094.6935 TBA 2026 Utility Reconstruction 50,000 - - <br />Storm water 0094.6935 TBA 2027 Equipment Replacement 20,000 - - <br />Storm water 0094.6935 TBA 2027 Pond dredging - TBD 750,000 - - <br />Storm water 0094.6935 TBA 2027 Saving for flood control structure replacement 200,000 - - <br />Storm water 0094.6935 TBA 2027 Utility Reconstruction 50,000 - - <br />Storm water 0094.6935 TBA 2028 Rate Control,water quality, structure Rehab projects 100,000 - - <br />Storm water 0094.6935 TBA 2028 Saving for flood control structure replacement 200,000 - - <br />Storm water 0094.6935 TBA 2028 Utility Reconstruction 50,000 - - <br />Storm water 0094.6935 TBA 2029 Equipment Replacement 20,000 - - <br />Storm water 0094.6935 TBA 2029 Saving for flood control structure replacement 200,000 - - <br />Storm water 0094.6935 TBA 2029 Yunkers Park storage project 1,500,000 - - <br />Storm water 0094.6935 TBA 2029 Utility Reconstruction 50,000 - - <br />Storm water 0094.6935 TBA 2030 Capital 1,837,500 - - <br />Storm water 0094.6935 TBA 2030 Utility Reconstruction 50,000 - - <br />2,432,985$ 375,000$ <br />(1) Secured grants of $1,325,000 have been included in the cash flow analysis below; the City has also applied for an additional $80K of <br />grants and identified $400K in other potential grant opportunities. <br />71 <br />Sample