Laserfiche WebLink
Additional Comments•Impervious Surface = 30.2% <br />•Max. allowed is 75% for LI Districts <br />•Traffic Study <br />•Formal study not required <br />•CSAH 14 (Main Street) is A-Minor Arterial Connector <br />•Primary ingress and egress <br />•200 students taking day &evening classes <br />•Driveway to Victor Path is for deliveries and emergency access <br />only <br />•Public Land Dedication <br />•NA-existing lot of record and not being subdivided <br />21