<br />Addressed in Stormwater Management Plan. Applicant shall update the <br />SWPPP. <br />SWPPP updated per the SWMP. <br />15.The applicant shall verify the lot lines on Lot 12 Block 4, Lot 4 Block 1, and Lot 5 <br />Block 1. It appears the structures may encroach on the drainage and utilit y <br />easements. Plan updated. <br />The applicant shall verify the lot lines on Lot 24 Block 7. It appears the <br />structure may encroach on the drainage and utility easement. <br />Lot lines revised in this area as well as pad locations. <br />16.The applicant shall include the bottom elevation of the infiltration basin on the <br />grading plans. Elevations added. <br />Applicant shall verify the bottom elevation, as it differs between HydroCAD <br />model, plans, and Appendix C. Verify the culvert outlet elevation; outlet <br />should be above the exfiltration elevation. As a note: planting medium is not <br />necessary below the bottom of the infiltration basin. <br />The infiltration is not intended to provide above-ground retention to prevent <br />oversaturating the back yards of the adjacent lots. The area is a flat infiltration <br />swale area. <br />The plan and HydroCAD Model now show the outlet elevation equal to the <br />infiltration basin bottom. Note that with this design, infiltration volume credit <br />cannot be claimed for IB10 and the SWMP must be updated. Volume of <br />infiltration is the ponded volume (volume from basin bottom to the outlet <br />elevation). <br />Outlet for infiltration basin 10 raised 0.5’ above bottom of basin. Per RCWD <br />comments, infiltration volumes have been updated. <br />17.The applicant shall verify the retention volume calculation for Pond 400 in Appendix <br />C as there appears to be an error. The volumes are correct. <br />18.If needed, the opportunity may exist to maximize infiltra tion at the infiltration basin <br />b y constructing the basin to minimize the separation between the bottom of the basin <br />and the water table. The basin needs minimum 3 feet separation from the water table <br />and cannot be lowered. <br />19.The applicant shall verify that the HWL of the Infiltration Basin is 2.0 feet below <br />the low entry elevations of surrounding buildings. Separation requirement is met <br />20.The applicant shall display and label emergenc y overflows with spot elevat ions and <br />drainage arrows at all ponds and sags, specificall y at the intersection of Street A <br />and Street C and at the cul-de-sac of Street C. EOF’s added. <br />21. The applicant shall confirm that there is a 10-ft. setback between the HW L of the <br />infiltration basin and the drainage and utility easements. HW L is covered by <br />easement. <br />22. The applicant shall verify that the top berm of stormwater ponds is 2 ft. above the <br />HW L of the pond. Berm updated. <br />23.The applicant shall label the safety bench on the plans. It shall be at least 10-ft wide. <br />The pond slope cannot be greater than a 3:1 slope. Comment noted. <br />The applicant shall label the safety bench on the plans. <br />Safety bench label added. <br />24. The storm sewer system and grading in the rear yards of Lot 1-3 Block 1 should be