My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-10-2020 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
08-10-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2021 2:38:36 PM
Creation date
11/17/2021 11:49:45 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/10/2020
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br /> <br />incorporated with the understanding that it is city maintained. After further discussions with <br />the Vickers, developer and City, the final design includes a conventional outlet structure with <br />discharge from Pond 100 to the private ditch with rip rap armor and no plunge pool dissipator. <br />The pond remained oversized further reducing the rate of runoff from the site which is well <br />below the existing conditions. <br /> <br />A Permanent Drainage & Utility Easement agreement between the Vickers and the City has <br />been agreed to and was recorded on July 6, 2020-Document No. 2268373.003. The City will <br />be responsible for stormwater maintenance within the easement area. Great River Energy <br />(GRE) has also approved the drainage easement and storm pipe through their easement. <br /> <br />Phasing <br /> <br />The site will be mass graded in one (1) phase and developed in two (2) phases. Phase 1 has 35 <br />lots and Phase 2 has 33 lots. <br /> <br />Utilities <br /> <br />Public water, sanitary and storm sewer utilities will be installed within the development. <br /> <br />Five (5) watermain and sanitary laterals are stubbed from Red Oak Lane south to 6687 20th <br />Avenue for future development of that parcel. <br /> <br />Sanitary Sewer <br /> <br />An 8”-10” sanitary sewer pipe, 4” forcemain and lift station will serve the site. The lift station <br />and pipe system will be designed to service a larger area in accordance with our City’s <br />Comprehensive Plan. <br /> <br />Both existing houses located at 6651 and 6677 20th Avenue are served by private septic <br />systems. The house located at 6677 20th Avenue is being relocated onto a new lot in the <br />subdivision. Both houses are required to connect to the municipal sanitary sewer system. <br /> <br />Watermain <br /> <br />A 16” diameter trunk watermain will be installed along Red Oak and Josephine to provide for a <br />future trunk loop to the west. This trunk line is part of the City’s Comprehensive Plan. The <br />remainder of the site will be served by an 8” watermain and loop back into the City’s trunk <br />watermain within Birch Street. <br /> <br />The house located at 6651 20th Avenue is connected to municipal city water. The relocated <br />house will also connect to municipal city water. <br /> <br />Public Land Dedication <br /> <br />The City will require cash in lieu of land dedication. Per the City’s Park, Greenway & Trail <br />System Plan, a future neighborhood park is programmed to the west of this site. Sidewalks <br />along the streets in the development will connect to future trail corridors along CSAH 34
The URL can be used to link to this page
Your browser does not support the video tag.