2 <br /> <br />• April 8, 2019: Resolution No. 19-42 Approving PUD Development Stage <br />Plan/Preliminary Plat <br />o Establishes development’s framework in regards to lot and yard requirements, <br />height regulations, impervious surface and design guidelines <br />• May 11, 2020: Resolution No. 20-44 approving PUD Development Stage Plan <br />Amendment #1-Site Plan and Grading & Drainage Plan <br /> <br />SUMMARY <br /> <br />On June 10, 2020, the Planning & Zoning Board reviewed the PUD Final Plan/Final Plat and <br />motioned to postpone recommendation to allow Lyngblomsten time to address some of the <br />Boards concerns. On July 15, 2020, the Planning & Zoning Board held a special work session <br />to review Lyngblomsten’s response. The following is a summary of discussion points from the <br />June 10th, July 15th and August 12th meetings: <br /> <br />Architecture and Exterior Elevations <br /> <br />• Cottage Homes <br /> <br />The Board requested an additional color scheme be added to the palette. A gray slate color was <br />added for a total of 3 different color schemes (blue, sage and gray). <br /> <br />• Senior Living Building <br /> <br />The color palette was revised to include siding colors more similar to the original plan. The <br />blue lap siding and white board 'n batten were applied differently to modify the overall exterior <br />composition. A stone cap/ledge was better defined in the renderings between the stone and the <br />siding to better differentiate between the materials. The heights of the parapets and main <br />entrance were increased to provide more building variation and interest. The stone was <br />removed from the exterior HVAC columns and utilized at grade to a minimum second floor <br />height. There are no longer any (4) story elevations with siding only. The "eyebrow" elements <br />are clad in the wood look fiberon product. The vertical signage at Gateway/Hodgson was <br />removed from the East side (remains on North and will be internally lit at night). <br /> <br />• Height <br /> <br />The following is a summary of the senior building height comparisons: <br /> <br /> <br />April 2019 <br /> <br />Top of Wall + <br />Parapet = <br />Total <br />May 2020 <br /> <br />Top of Wall + Parapet = <br />Total <br />August 2020 <br /> <br />Top of Wall + Parapet = <br />Total <br />Change <br />(May 2020 <br />to August <br />2020) <br />2 story-SC/MC 23’ + 2’ = 25’ 25’3”+ 2’11”=28’2” 25’3”+ 2’11”= 28’2” 0 <br />3 story-AL 33’ + 4’ = 37’ 35’10”+1’5” = 37’3” 35’10” + 2’4” = 38’2” +0’11” <br />4 story-IL 43’ + 3’ = 46’ 46’6” + 2’6” = 49’0” 46’6” + 4’ 0” = 50’6” +1’ 6” <br />Main Entrance 43’ + 5’ = 48’ 46’6” + 2’6” = 49’0” 50’6” + 1’ 8” = 52’ 2” +3’ 2”