My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-05-2020 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
10-05-2020 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2021 4:24:27 PM
Creation date
11/17/2021 11:55:00 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/05/2020
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />C:\Users\diane.hankee\AppData\Local\Microsoft\Windows\INetCache\Content.MSO\CAC44F8A.docx 701 XENIA AVENUE S | SUITE 300 | MINNEAPOLIS, MN | 55416 | 763.541.4800 | WSBENG.COM October 5, 2020 <br /> <br /> <br />City of Lino Lakes <br />Mr. Michael Grochala <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br /> <br />Re: Request for Proposal to Complete 2021 Street Improvement Projects <br /> <br />Dear Mr. Grochala: <br /> <br />The City of Lino Lakes is needing engineering services for the preparation of plans and <br />specifications for the 2021 Street Improvement Projects. The project includes: <br /> <br />2021 Street Reconstruction Project: <br /> <br />Full Depth Reclamation (approximately 2.2 miles) – Joyer Lane, Karth Road, Talle Lane, <br />Canfield Road, and Gaage Lane neighborhood roadways, and 4th Avenue (Main Street to <br />Pine Street). The estimated project cost is $2,600,000.00. <br /> <br />2021 Street Rehabilitation Project: <br /> <br />Full Depth Mill and Overlay / Reclamation (approximately 0.6 miles) – Forsham Lake <br />Drive, Post Road, and Stage Coach Trail (from cul du sac north 1,400 feet). The estimated <br />project cost is $795,000.00 including water system repairs. <br /> <br />Thin Overlay (approximately 1.6 miles) – James Street, Knoll Drive and Oak Lane as a * <br />Bid Alternate. The estimated project cost is $170,000.00. <br /> <br />Based on the project scope, WSB would perform the following tasks: <br /> <br />I. Prepare Final Project Construction Plans <br /> <br />Final construction plans will be prepared indicating the project locations and plan <br />view sheets. The 2021 Street Reconstruction project of Joyer Lane, Karth Road, and <br />Gaage Lane neighborhood roadways, and 4th Avenue (Main St to the north) will include <br />topographic survey. The 2021 Rehabilitation project will not be surveyed, similar to past <br />projects, as the curb and gutter will remain. Base drawing information will include <br />GSOC design locates, curb inspection, city parcel map information and record plans. <br /> <br />II. Final Quantities <br />
The URL can be used to link to this page
Your browser does not support the video tag.