Laserfiche WebLink
2021 BUDGET <br /> <br />BACKUP GENERATOR ‐ LIFTSTATION 8 <br />$32,000 <br />  <br />Staff is recommending the acquisiƟon and installaƟon of a backup generator for LiŌ StaƟon 8, located at 6698  <br />21st Ave.  This liŌ staƟon will accept all the flow from the Watermark development.  The purpose of the back- <br />up generator is to supply power during outages to the pumps that move the waste water down the line.   <br />Without power at a liŌ staƟon, there is potenƟal within a few hours for waste water to back-up into resi- <br />dent’s homes.  In addiƟon to keeping  the pumps operaƟng during a power outage, the monitoring system  <br />would conƟnue to funcƟon remotely informing UƟliƟes Department staff of any alarms, failures, or high lev- <br />els.    <br />Recommended funding is the Sewer OperaƟng Fund - Capital Outlay.