Laserfiche WebLink
2021 BUDGET <br /> <br />MIXER PUMP ‐ LIFT STATION #8 <br />$15,000 <br />  <br />The UƟliƟes Department is recommending funding to install a mixer pump at LiŌ StaƟon #8 (6998 21st  <br />Avenue).  The funcƟon of a mixer pump is to churn up the waste water so there is constant movement,  <br />thereby eliminaƟng seƩling.  PrevenƟng waste water from seƩling is criƟcal to ensure fats, oil, and grease  <br />(FOG) do not solidify and accumulate.  Once FOG solidifies, it aƩaches to floats (control the pumps cy- <br />cling on and off), pumps, transducers (wet well level indicator), guide rails and the wet well itself.  This  <br />could result in sewer backups, pump failures, and premature equipment failures.  It is the City's pracƟce  <br />to have mixer pumps installed on all new liŌ staƟons.  <br />The budget request includes the mixer pump, guide rail system, electrical work, and labor.  Recommend- <br />ed funding is the Sewer OperaƟng Fund - Capital Outlay.