My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-14-2020 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2020
>
12-14-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 10:00:23 AM
Creation date
11/17/2021 12:00:41 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/14/2020
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br /> <br />1. Ensure developers meet the standards specified within the land-use plan and official <br />controls, including zoning and subdivision ordinances and official maps. <br />2. Ensure compatibility of adjacent land uses. <br /> <br />Bald Eagle Addition is compliant with the zoning and subdivision ordinances. It is also <br />compatible with adjacent residential land uses. <br /> <br />Housing Plan <br /> <br />Goal 1: Ensure housing development is compatible with existing and adjacent land uses and <br />provides accessibility to key community features and natural resources. <br /> <br />Bald Eagle Addition meets the goals of the housing plan. The development is compatible with <br />the existing and adjacent residential homes. <br /> <br />Transportation Plan <br /> <br />Goal 1: Plan for and achieve required street improvements and connectivity throughout the <br />City of Lino Lakes. <br /> <br />Second Avenue is a major collector road and has capacity to accommodate one (1) new single <br />family home . <br /> <br />Sanitary Sewer Plan <br /> <br />Goals of the sanitary sewer plan are to ensure well-planned, quality residential development <br />that conserves and enhances the city’s natural resources and to provide an affordable and safe <br />sanitary sewer system. <br /> <br />An 8” sanitary sewe r main exists along both Elm Street and Second Avenue. The existing <br />house is connected to municipal sanitary sewer. The new house will also be connected to <br />municipal sanitary sewer. The system has capacity for one (1) additional single family home. <br /> <br />Wat er Supply Plan <br /> <br />A goal of the water supply plan is to provide residents affordable potable water that is safe and <br />of high quality for daily consumption and fire demand. <br /> <br />A 12” watermain exists along Elm Street. The existing house is connected to municipal <br />watermain. <br /> <br />A 6” watermain exists along Second Avenue. The new house will also be connected to <br />municipal watermain. <br /> <br />Planning Districts <br />
The URL can be used to link to this page
Your browser does not support the video tag.