Laserfiche WebLink
3. Tree inventory and preservation and mitigation plan must be provided to the city. <br />4. Buffer and screen standards have not been met for the west perimeter, as a <br />triangulated, double row of plants is required. Plants with a shorter mature height <br />(2-3') should be used to form this buffer. <br />5. Canopy cover requirements have not been met. <br />6. Foundation landscape standards have not been met. 1 large tree and 3 large <br />shrubs will be required for the west face of the building. <br />7. Autumn Blaze maples have poor structure and are prone to defects. Replace <br />Autumn Blaze maple with another variety of maple or another species. <br />8. The landscape details indicate MnDOT 33-261 will be used for the stormwater <br />management areas, but MnDOT 33-262 is indicated on the C7 details page. This <br />should be changed to match the landscape details page (33-261). <br />9. The landscape plan indicates sod will be used in all areas not planted with <br />MnDOT 33-261, but the C7 details page indicates MnDOT 25-131, low <br />maintenance turf seed. Clarify which of the two turf types will be used and <br />ensure plans match. <br />10. Irrigation should only be needed for the areas with turf, trees, or shrubs. The <br />stormwater seed mix areas should not require irrigation. <br />ATTACHMENTS <br />1. Aerial Photo — Precision Tune <br />2. Erosion Control Plan (Sheet C5) <br />3. Proposed Drainage Conditions (pg. 4 of 95 of Rice Creek Drainage Calcs.) <br />4. Landscape Plan (Sheet L1.1) <br />5. Landscape Details (Sheet L1.2) <br />6. Notes and Details (Sheet C7) <br />7 <br />