Laserfiche WebLink
--Collector or Arterial <br />40 ft <br />81.5 ft <br />--Parking Lot <br />15 ft <br />15 ft <br />Rear <br />--Principal' <br />35 ft <br />45 ft <br />--Accessory <br />5 ft <br />16 ft <br />--Parking Lot <br />loft <br />loft <br />-Side (north) <br />--Principal <br />loft <br />44 ft <br />--Accessory <br />loft <br />15 ft <br />-Side (south) <br />--Principal <br />loft <br />41 ft <br />--Accessory <br />loft <br />120 ft <br />'Per the GB, General Business District, commercial building setback from residential <br />properties is 35 ft. <br />Architectural Plans and Exterior Building Materials <br />Per the architectural plan set prepared by Building Foundry dated November 8, 2021, the <br />exterior materials of the building include split face concrete block, steel garage doors, <br />glass doors and windows, and painted red concrete block. The applicant shall provide the <br />percentage of building facade with contrasting colors. The building does not have a well- <br />defined base, middle and top. The zoning ordinance requirements are not met. <br />The building floor plan is 4,125 sf and consists of six (6) auto service bays, reception <br />area, waiting area, employee break room, office and toilet rooms. <br />The building height is 18' 0" to the peak of the roof which is less than the maximum <br />allowed 45 feet. <br />A trash enclosure is proposed to serve the new building. Construction details indicate <br />light beige split face concrete block to match the proposed building. The gate is painted <br />treated wood. The enclosure is 6 feet in height. The trash enclosure meets performance <br />standards. <br />Mechanical equipment is located on the rooftop. No screening details were provided. <br />The rooftop mechanical will need to be fully screened. <br />The building will be sprinkled for fire suppression. <br />4 <br />