My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/12/2022 Item 7A, ZOTA-Administration Section
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2022
>
01/12/2022 Item 7A, ZOTA-Administration Section
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2022 11:11:29 AM
Creation date
1/7/2022 4:01:54 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Other
Meeting Date
01/12/2022
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2-19 <br /> <br />c. Utility (Sewer and Water) Plans. <br /> <br />d. Local Water Management Plan. <br /> <br />e. Capital Improvement Plan. <br /> <br />f. Policy Plan <br /> <br />g. Natural Environment Plan <br /> <br />2.(a) The proposed development application is compatible with present and future land <br />uses of the area. <br /> <br />3.(a) The proposed development application conforms to performance standards herein <br />and other applicable City Codes. <br /> <br />4.(a) Traffic generated by a proposed development application is within the capabilities of <br />the City when: <br /> <br />a. Traffic generated by a proposed development will not degrade the level of <br />service outside of the proposed development to a level worse than the existing level of service. <br />(Level of service as defined by the Highway Capacity Manual.) <br /> <br />b. The existing level of service must be D or better for any street providing access <br />to the development. If the existing level of service is E or F, the subdivision developer must <br />provide, as part of the proposed project, improvements needed to ensure a level of service D or <br />better. <br /> <br />c. Existing roads providing access to the development have the structural <br />capacity to accommodate projected traffic from the proposed subdivision or the developer will pay <br />to correct any structural deficiencies. <br /> <br />d. The traffic generated from a proposed development shall not require City street <br />improvements that are inconsistent with the Lino Lakes Capital Improvement Plan or the developer <br />shall pay to correct any street deficiencies. <br /> <br />5. The proposed development shall be served with adequate and safe water supply. <br /> <br />6. The proposed development shall be served with an adequate and safe sanitary <br />sewer system. <br /> <br />7. The proposed development shall not result in the premature expenditures of City <br />funds on capital improvements necessary to accommodate the proposed development. <br /> <br />(e) The Zoning Administrator shall make a determination on approval or denial of the <br />administrative permit within sixty (60) days from the date of submission of a complete application <br />unless the review is extended as allowed by MN Stat. 15.99.
The URL can be used to link to this page
Your browser does not support the video tag.