My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-24-2022 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
01-24-2022 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 5:30:21 PM
Creation date
1/21/2022 2:17:18 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/24/2022
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
buffers for wetland protection and natural resource conservation, and open space and trails for <br />people. <br />A maintenance access trail is provided around Pend Lake 200. This access trail will be graded, <br />but will not require gravel or paved improvements. <br />The site will be mass graded in one (1) phase. Residential home development will occur over <br />several years. <br />Utilities <br />Public water, sanitary and storm sewer utilities will be installed within the development. <br />Sanitary Sewer <br />A 21" trunk sanitary sewer main located along CSAH 14 (Main Street) serves the site. An 8" <br />and 10" sanitary sewer pipe serves the site internally. Future development to the north will <br />potentially require a lift station. Sanitary sewer will also be stubbed to the west to <br />accommodate future development. <br />Watermain <br />A 12" trunk watermain located along CSAH 14 (Main Street) serves the site. An 8" and 16" <br />watermain serve the site internally and loops the system to CSAH 14 (Main Street). Watermain <br />will be stubbed to the west and north property boundaries for future development. <br />Public Land Dedication <br />The City will require cash in lieu of land dedication. Per the City's Park, Greenway & Trail <br />System Plan, a neighborhood park is not programmed for this area. Lino Lakes Elementary <br />School is immediately adjacent to the development. <br />Natures Refuge <br />61 lots x $34,40 $3,160a= <br />$192,760 <br />Trail Construction Costs Credit = ($5 ) <br />$77,000 <br />TOTAL = Q'�0 <br />$115,760 <br />a2022 City Fee Schedule Applies <br />The Park, Greenway & Trail System Plan identifies the need for a future city trail running <br />north -south through the development along greenway corridor. Due to concerns regarding <br />potential impacts to the rare plant species behind Lots 1-4, Block 5, an 8.5 foot wide paved trail <br />will be constructed on the west side of the development along Pond 100 and Lake 200 utilizing <br />the maintenance access path. <br />
The URL can be used to link to this page
Your browser does not support the video tag.