My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/09/2022 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2022
>
02/09/2022 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2022 10:17:33 AM
Creation date
2/4/2022 2:10:05 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
02/09/2022
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANALYSIS <br />Section 1007.050 of the Zoning Ordinance establishes requirements for earth moving and <br />land reclamation. Earth removal, land reclamation, material storage or filling is a <br />permitted use in all zoning districts. A conditional use permit is required when 5,000 <br />cubic yards or more of material is planned to be removed or deposited on any lot or <br />parcel. <br />The three parcels are approximately 18.36 acres and are located between 21st Avenue S <br />and I-35E. The proposed stockpile will be approximately 2.7 acres in area, will have a <br />maximum height of 40 feet, and will be approximately 100,000 cubic yards of black dirt <br />according to the plans. The applicant estimates there will be a maximum of 50 trucks per <br />day accessing the site. <br />Access <br />The site is located at the intersection of 215t Avenue S and Commerce Drive. The <br />applicant is currently proposing access to the site from 21st Avenue S via a rock <br />construction entrance that will be converted to a gravel entrance after the initial import of <br />the black dirt material. <br />Wetlands <br />Wetlands are shown on the plan sheet and do not appear to be impacted by the black dirt <br />stockpile. A wetland delineation was completed onsite in June of 2021 by Kjolhaug <br />Environmental Services Company, Inc. The Wetland Delineation Report dated August 5, <br />2021 states there are five (5) wetlands onsite. The estimated wetland boundaries are <br />shown to be at a sufficient distance from the proposed areas of disturbance. As the <br />proposed, the project will not impact any wetlands. <br />Drainage Ditches <br />Judicial Ditch No. 3 (Clearwater Creek) borders adjacent property to the south of the site <br />and a private drainage ditch runs on the easterly side of the property. The applicant is not <br />proposing any changes to the existing drainage patterns to the drainage ditches. <br />Floodplain <br />The 2015 DFIRM indicates Zone A floodplain on the site. The applicant is not proposing <br />any impacts to the floodplain on the site. <br />Grading and Drainage <br />A Grading, Drainage & Erosion Control plan was submitted and has been reviewed by <br />the City Engineer and Environmental Coordinator. Please see attached comments. <br />
The URL can be used to link to this page
Your browser does not support the video tag.