My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/23/2022 EB Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2022
>
02/23/2022 EB Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2022 8:18:53 AM
Creation date
2/18/2022 1:56:43 PM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
02/23/2022
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
meetings as necessary to complete tasks detailed below. <br />2. Review and summary of existing conditions including but not limited to delineation of <br />drainage area, existing land use, flood plain, and high level wetland <br />location/type/quality and issue identification. <br />3. Preparation of water quality, and Hydrologic and Hydraulic modeling of existing and full <br />build scenarios. <br />4. Recommendation on possible phasing plan for transition of the private ditch system <br />into a publicly (City) managed system. <br />5. Development of site specific ditch corridor improvement concepts, phasing plan and <br />alternatives analysis including but not limited to modification of the stream corridor <br />to improve water quality and habitat, placement of other future site appropriate <br />BMP’s, and /or wetland restoration. The scope of work should identify the <br />approximate number of concepts that would be developed. <br />6. For each conceptual BMP listed in #5 above include rough cost estimate, estimated <br />load reductions and high level assessment of feasibility of each conceptual BMP. <br />7. Summary of permitting requirements and identification of potential funding sources <br />for any proposed improvements. <br />8. Final Report. <br />City of Lino Lakes and VLAWMO Responsibilities <br />The City of Lino Lakes will provide a GIS data set including: <br /> Parcel and property information <br /> Storm water infrastructure <br /> 2 foot contours <br /> 2020 aerial photos <br />The VLAWMO will provide: <br /> Prior wetland inventories and delineations <br /> Bathymetry survey conducted in 2021 <br /> Macrophyte survey conducted in 2021 <br /> Additional aerial photos as needed (available through Nearmap) <br /> GIS layers (or city) including but not limited to NWI, soils, roads/streams, land use <br />(2010) <br />Anticipated Timeline For Completion <br />The agencies are requesting completion of the study within 6 months of notice to proceed. <br />Submittal Requirements <br />Firms replying to this request are required to submit the following information (please limit <br />submittal to 5 pages or less): <br /> <br />1. Scope of work including proposed tasks and deliverables. <br />2. Cost estimate with approximate rate and hours per each proposed task and any additional
The URL can be used to link to this page
Your browser does not support the video tag.