Laserfiche WebLink
oo INH Project Description <br />oo ALTA Survey prepared by Carlson McCain dated November 12, 2021 <br />oo Final Plat for NorthPointe 8th Addition prepared by Carlson McCain received December <br />13, 2021 <br />oo Civil Plan Set, Landscape Plan and Tree Preservation Plan prepared by Carlson McCain <br />dated December 10, 2021 <br />oo Lighting Plan prepared by Luma Sales Associates dated December 9, 2021 <br />oo Architectural Plan Set prepared by Cole Group Architecture dated December 23, 2021 <br />oo Stormwater Management Plan prepared by Carlson McCain dated December 10, 2021 <br />oo Wetland Delineation Report prepared by Kjolhaug Environmental Services Company, <br />Inc. dated September 8, 2021 <br />oo Traffic Analysis Memorandum prepared by S2 Traffic Solutions dated December 13, <br />2021 <br />oo Traffic Noise Assessment prepared by David Braslau Associates, Inc. dated January 5, <br />2022 <br />ANALYSIS <br />History <br />The subject site is legally described as Outlot A, NorthPointe 5th Addition and is part of the <br />NorthPointe residential housing development. Per the 2014 Council Resolution No. 14-21 <br />approving the entire NorthPointe PUD Development Stage Plan/Preliminary Plat, this outlot is <br />required to be developed as an age restricted (55+) multiple family dwelling consistent with the <br />regulations of the R-4, High Density Residential District with underground parking for 50% of <br />the required stalls and at a density of 20 to 25 dwelling units per acre. Future development of <br />this outlot shall require a PUD Final Plan/Final Plat, Development Contract and Site Plan <br />Review. The Developer shall record against the outlot a declaration or other document stating <br />these requirements. <br />Proposed Project <br />Per the Applicant's Project Description, the improvements will consist of a 3 story 72 unit <br />building, constructed over a one story at -grade parking garage (with 1:1 stalls per unit), totaling <br />a 4 story building. The project will be constructed out of wood framing with the use of varying <br />pitched roofs to give architectural appeal to the area. The use of varying styles of stone/brick <br />help the building meet the 33% material requirements, while giving an aesthetic feel to the <br />fagade. Varying siding and decorative elements make up the rest of the building design. <br />Multiple amenity spaces are incorporated within the building enhancing the overall experience <br />for the residents of this project. Featured amenities will include: On -site Management Office, <br />Community Room, Fitness Center, Mail and Package Lockers, Woodshop, Game Room and <br />Salon. A variety of floor plans will include One Bedroom, One Bedroom + Den, Two <br />Bedroom and Two Bedroom + Den options for residents to select. <br />A tentative 15 month construction schedule is May/June 2022 start and August 2023 <br />completion and occupancy. <br />