My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/12/2020 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2020
>
08/12/2020 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 11:34:25 AM
Creation date
3/16/2022 10:24:17 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
08/12/2020
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />08/05/2020 <br />Page 9 <br />I e e - . i . 1111 . - . .", I I'll I 1 .11 - -M!" - - <br />.. .............. <br />-., <br />10. Applicant shall specify material and size of casing pipe on plans for watermain crossings <br />at Hodgson. Per Anoka County, HDPE watermain may be drilled without casing pipe if <br />applicant finds HDPE watermain to be more cost effective for the crossings. <br />THIS WILL BE SUBMITTED BY THE UTILITY CONTRACTOR. CASING MATERIAL <br />AND SIZE IS DETERMINED BY UTILITY CONTRACTOR PER THE PROJECT <br />SPECIFICATIONS. <br />Noted. <br />. :\ItS1:Sl...... .....Of <br />-. <br />• Sanitary Sewer <br />The project site is currently not served by municipal sanitary sewer. The City of Lino Lakes is <br />working on a trunk sanitary sewer project including a Lift Station and forcemain to serve <br />approximately 60 acres. This service area includes the Lyngblomsten site and an unserviced area <br />east of Hodgson Road. The Lyngblomsten project proposes serving the development with municipal <br />sanitary sewer and services extended to each lot. <br />Comments: <br />1. The applicant shall note the sewer connection location at the lift station will need to be <br />adjust as the City finalizes the construction plans for this project. <br />Noted. <br />The invert at the lift station will need to be modified, it should be at 889.XX. <br />This outlet invert has been labeled. (AJA 2020-05.08) <br />City staff with provide current version of the lift station layout. Please update <br />Lyngblomsten plans accordingly. <br />AJA 7111/2020: LIFT STATION LAYOUT WAS NOT PROVIDED <br />Lift station layout has been provided. Please include a hydrant near the lift <br />station. <br />The applicant shall provide profile views of the proposed sanitary sewer in the <br />construction plans. <br />Pro -files .sill be a pl'ohGd .yith fho final r• nofr Gtie plane <br />and the profile .i ted General profile n nts ipnl, de: <br />a Applinanf shall adjust everlappiRg popeand m nhple lahnlc <br />A IA OVERLAPPING LABELS S REARRANGED TO NOT QC <br />OVERLAPPING. <br />Lyngblomsten Preliminary Plat Engineering Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.