My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/12/2020 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2020
>
08/12/2020 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 11:34:25 AM
Creation date
3/16/2022 10:24:17 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
08/12/2020
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Principal Building <br />loft <br />50 ft <br />Accessory Building <br />loft <br />NA <br />Parking Lot/Driveway <br />loft <br />5ft1 <br />Setbacks -Rear Yard (Private Road) <br />Required <br />Proposed <br />Principal Building <br />30 ft <br />50 ft <br />Accessory Building (trash enclosure) <br />5 ft <br />18 ft <br />Parking Lot/Driveway <br />loft <br />15 ft <br />This shall be revised to 10 feet. <br />Architectural Plans and Exterior Building Materials <br />The retail building is single story with exterior materials consisting of brick, glass and <br />EIFS. The color palette consists of earth tone dark gray, brown, light tan brick and light <br />gray, medium gray, dark bronze and teal EIFS. Metal canopy and fabric awnings also <br />accent the building. <br />The ordinance allows for stucco or EIFS on no more than 30% of the primary front <br />building elevation and no more than 60% of any side or rear building elevation. The <br />primary front elevation has 14% EIFS and rear elevation has 47% EIFS and the sides <br />have 26% and 19%. The materials and percentages are compliant with performance <br />standards. <br />The building height is 23' 8" which is less than that maximum 45 ft allowed. <br />A trash enclosure is proposed on the north side of building. Construction details <br />provided on Sheet A3 indicate light tan and brown utility brick over concrete block. The <br />gate is painted metal deck swing gate that has 100% opacity. The enclosure is 7' 6" in <br />height. The trash enclosure meets performance standards. <br />Per Sheet A3, the mechanical equipment is located on the rooftop and screened by <br />parapets. <br />The building will be sprinkled for fire suppression. <br />Drive -through <br />The east end cap suite is proposed to have a drive -through for a coffee shop or fast food <br />restaurant. Drive -through service facilities are allowed accessory uses in the GB, General <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.