Laserfiche WebLink
Bid Tabulation <br />2022 East Shadow Lake Drive Utility Project (#8144580) <br />City of Lino Lakes, MN <br />WSB Project No. 017705-000 <br />Bid Opening: Tuesday, April 19, 2022, at 10:00 am <br />DENOTES CORRECTED FIGURE <br />wsb <br />Engineer's Estimate <br />Meyer Contracting Inc. <br />T. A. Schifsky & Sons, Inc <br />Line No. <br />Material No. <br />Item <br />Units <br />Quantity <br />Unit Price <br />Total Price <br />Unit Price <br />Total Price <br />Unit Price <br />Total Price <br />33 <br />2573.503 <br />SEDIMENT CONTROL LOG TYPE WOOD FIBER <br />L F <br />650 <br />$4.00 <br />$2,600.00 <br />$3.30 <br />$2,145.00 <br />$3.00 <br />$1,950.00 <br />34 <br />2574.507 <br />COMMON TOPSOIL BORROW <br />C Y <br />200 <br />$38.00 <br />$7,600.00 <br />$29.50 <br />$5,900.00 <br />$47.25 <br />$9,450.00 <br />35 <br />2575.504 <br />SODDING TYPE LAWN <br />S Y <br />1022 <br />$15.00 <br />$15,330.00 <br />$10.00 <br />$10,220.00 <br />$10.50 <br />$10,731.00 <br />$249,597.00 <br />$332,731.00 <br />$337,762.90 <br />B. SANITARY SEWER IMPROVEMENTS <br />36 <br />2104.502 <br />REMOVE MANHOLE <br />EACH <br />2 <br />$750.00 <br />$1,500.00 <br />$557.00 <br />$1,114.00 <br />$1,155.00 <br />$2,310.00 <br />37 <br />2104.502 <br />REMOVE CASTING <br />EACH <br />2 <br />$250.00 <br />$500.00 <br />$89.00 <br />$178.00 <br />$278.25 <br />$556.50 <br />38 <br />2104.503 <br />REMOVE SEWER PIPE (SANITARY) <br />L F <br />392 <br />$12.00 <br />$4,704.00 <br />$9.50 <br />$3,724.00 <br />$5.51 <br />$2,159.92 <br />39 <br />2104.503 <br />REMOVE SANITARY SERVICE PIPE <br />L F <br />212 <br />$14.00 <br />$2,968.00 <br />$7.80 <br />$1,653.60 <br />$5.51 <br />$1,168.12 <br />40 <br />2123.61 <br />UTILITY CREW <br />HOUR <br />10 <br />$150.00 <br />$1,500.00 <br />$1,015.00 <br />$10,150.00 <br />$1,575.00 <br />$15,750.00 <br />41 <br />2503.601 <br />SANITARY SEWER BYPASS PUMPING <br />L S <br />1 <br />$15,000.00 <br />$15,000.00 <br />$9,736.00 <br />$9,736.00 <br />$0.01 <br />$0.01 <br />42 <br />2503.602 <br />CONNECT TO EXISTING SANITARY SEWER <br />EACH <br />3 <br />$1,200.00 <br />$3,600.00 <br />$1,133.00 <br />$3,399.00 <br />$1,680.00 <br />$5,040.00 <br />43 <br />2503.602 <br />CONNECT TO EXISTING SANITARY SEWER SER <br />EACH <br />7 <br />$750.00 <br />$5,250.00 <br />$460.00 <br />$3,220.00 <br />$551.25 <br />$3,858.75 <br />44 <br />2503.602 <br />10"X4" PVC WYE <br />EACH <br />7 <br />$550.00 <br />$3,850.00 <br />$1,179.00 <br />$8,253.00 <br />$669.90 <br />$4,689.30 <br />45 <br />2503.603 <br />10" PVC PIPE SEWER SDR 26 <br />L F <br />392 <br />$50.00 <br />$19,600.00 <br />$147.00 <br />$57,624.00 <br />$106.05 <br />$41,571.60 <br />46 <br />2503.603 <br />4" PVC SANITARY SERVICE PIPE <br />L F <br />212 <br />$22.00 <br />$4,664.00 <br />$128.50 <br />$27,242.00 <br />$75.60 <br />$16,027.20 <br />47 <br />2506.502 <br />CASTING ASSEMBLY <br />EACH <br />2 <br />$350.00 <br />$700.00 <br />$1,331.00 <br />$2,662.00 <br />$1,575.00 <br />$3,150.00 <br />48 <br />2506.603 <br />CONSTRUCT 48" DIA SANITARY MANHOLE <br />L F <br />30.5 <br />$425.00 <br />$12,962.50 <br />$659.00 <br />$20,099.50 <br />$698.25 <br />$21,296.63 <br />$76,798.50 <br />$149,055.10 <br />$117,578.03 <br />C. WATER MAIN <br />IMPROVEMENTS <br />49 <br />2104.502 <br />REMOVE GATE VALVE & BOX <br />EACH <br />3 <br />$150.00 <br />$450.00 <br />$203.50 <br />$610.50 <br />$220.50 <br />$661.50 <br />50 <br />2104.502 <br />REMOVE CURB STOP & BOX <br />EACH <br />7 <br />$175.00 <br />$1,225.00 <br />$203.00 <br />$1,421.00 <br />$274.05 <br />$1,918.35 <br />51 <br />2104.502 <br />REMOVE HYDRANT <br />EACH <br />1 <br />$1,000.00 <br />$1,000.00 <br />$610.00 <br />$610.00 <br />$822.15 <br />$822.15 <br />52 <br />2104.503 <br />REMOVE WATER MAIN <br />L F <br />358 <br />$12.00 <br />$4,296.00 <br />$9.10 <br />$3,257.80 <br />$11.03 <br />$3,948.74 <br />53 <br />2104.503 <br />REMOVE WATER SERVICE PIPE <br />L F <br />213 <br />$14.00 <br />$2,982.00 <br />$11.50 <br />$2,449.50 <br />$5.51 <br />$1,173.63 <br />54 <br />2123.61 <br />UTILITY CREW <br />HOUR <br />10 <br />$150.00 <br />$1,500.00 <br />$1,000.00 <br />$10,000.00 <br />$1,575.00 <br />$15,750.00 <br />55 <br />2504.601 <br />TEMPORARY WATER SERVICE <br />LS <br />1 <br />$15,000.00 <br />$15,000.00 <br />$6,018.00 <br />$6,018.00 <br />$12,600.00 <br />$12,600.00 <br />56 <br />2504.602 <br />CONNECT TO EXISTING WATER MAIN <br />EACH <br />3 <br />$1,200.00 <br />$3,600.00 <br />$2,298.00 <br />$6,894.00 <br />$3,622.50 <br />$10,867.50 <br />57 <br />2504.602 <br />CONNECT TO EXISTING WATER SERVICE <br />EACH <br />7 <br />$750.00 <br />$5,250.00 <br />$555.50 <br />$3,888.50 <br />$337.05 <br />$2,359.35 <br />58 <br />2504.602 <br />HYDRANT <br />EACH <br />1 <br />$4,200.00 <br />$4,200.00 <br />$7,930.00 <br />$7,930.00 <br />$7,377.30 <br />$7,377.30 <br />59 <br />2504.602 <br />1" CORPORATION STOP <br />EACH <br />7 <br />$350.00 <br />$2,450.00 <br />$996.00 <br />$6,972.00 <br />$506.10 <br />$3,542.70 <br />