Laserfiche WebLink
Bid Tabulation <br />2022 East Shadow Lake Drive Utility Project (#8144580) <br />City of Lino Lakes, MN <br />WSB Project No. 017705-000 <br />Bid Opening: Tuesday, April 19, 2022, at 10:00 am <br />DENOTES CORRECTED FIGURE <br />wsb <br />Engineer's Estimate <br />Meyer Contracting Inc. <br />T. A. Schifsky & Sons, Inc <br />Line No. <br />Material No. <br />Item <br />Units <br />Quantity <br />Unit Price <br />Total Price <br />Unit Price <br />Total Price <br />Unit Price <br />Total Price <br />A. SURFACE IMPROVEMENTS <br />1 <br />2021.501 <br />MOBILIZATION <br />LS <br />1 <br />$21,132.00 <br />$21,132.00 <br />$34,126.00 <br />$34,126.00 <br />$34,000.00 <br />$34,000.00 <br />2 <br />2104.502 <br />SALVAGE SIGN <br />EACH <br />3 <br />$150.00 <br />$450.00 <br />$40.00 <br />$120.00 <br />$50.00 <br />$150.00 <br />3 <br />2104.503 <br />SAWING CONCRETE PAVEMENT (FULL DEPTH) <br />L F <br />24 <br />$6.00 <br />$144.00 <br />$3.50 <br />$84.00 <br />$3.00 <br />$72.00 <br />4 <br />2104.503 <br />SAWING BIT PAVEMENT (FULL DEPTH) <br />L F <br />177 <br />$4.00 <br />$708.00 <br />$2.50 <br />$442.50 <br />$3.00 <br />$531.00 <br />5 <br />2104.503 <br />REMOVE CURB & GUTTER <br />L F <br />798 <br />$10.00 <br />$7,980.00 <br />$2.40 <br />$1,915.20 <br />$7.00 <br />$5,586.00 <br />6 <br />2104.504 <br />REMOVE CONCRETE DRIVEWAY PAVEMENT <br />S Y <br />38 <br />$10.00 <br />$380.00 <br />$11.50 <br />$437.00 <br />$10.00 <br />$380.00 <br />7 <br />2104.504 <br />REMOVE BITUMINOUS DRIVEWAY PAVEMENT <br />S Y <br />168 <br />$8.00 <br />$1,344.00 <br />$6.50 <br />$1,092.00 <br />$8.00 <br />$1,344.00 <br />8 <br />2104.504 <br />REMOVE BITUMINOUS PAVEMENT <br />S Y <br />1354 <br />$5.00 <br />$6,770.00 <br />$4.60 <br />$6,228.40 <br />$5.00 <br />$6,770.00 <br />9 <br />2104.601 <br />SALVAGE AND REINSTALL LANDSCAPE STRUCTURES <br />L S <br />1 <br />$5,000.00 <br />$5,000.00 <br />$504.00 <br />$504.00 <br />$1,500.00 <br />$1,500.00 <br />10 <br />2106.507 <br />EXCAVATION - COMMON (P) <br />C Y <br />449 <br />$18.00 <br />$8,082.00 <br />$44.00 <br />$19,756.00 <br />$33.00 <br />$14,817.00 <br />11 <br />2106.507 <br />EXCAVATION - SUBGRADE (P) <br />C Y <br />942 <br />$35.00 <br />$32,970.00 <br />$45.00 <br />$42,390.00 <br />$33.00 <br />$31,086.00 <br />12 <br />2106.507 <br />SELECT GRANULAR EMBANKMENT (CV) (P) <br />C Y <br />942 <br />$10.00 <br />$9,420.00 <br />$47.25 <br />$44,509.50 <br />$25.00 <br />$23,550.00 <br />13 <br />2106.601 <br />DEWATERING <br />LS <br />1 <br />$15,000.00 <br />$15,000.00 <br />$41,005.00 <br />$41,005.00 <br />$38,000.00 <br />$38,000.00 <br />14 <br />2108.504 <br />GEOTEXTILE FABRIC TYPE 5 <br />S Y <br />3552 <br />$3.00 <br />$10,656.00 <br />$2.80 <br />$9,945.60 <br />$2.50 <br />$8,880.00 <br />15 <br />2112.519 <br />SUBGRADE PREPARATION <br />RDST <br />4.7 <br />$500.00 <br />$2,350.00 <br />$401.50 <br />$1,887.05 <br />$1,000.00 <br />$4,700.00 <br />16 <br />2123.61 <br />SKID LOADER <br />HOUR <br />10 <br />$125.00 <br />$1,250.00 <br />$156.50 <br />$1,565.00 <br />$100.00 <br />$1,000.00 <br />17 <br />2123.61 <br />STREET SWEEPER (WITH PICKUP BROOM) <br />HOUR <br />25 <br />$150.00 <br />$3,750.00 <br />$155.00 <br />$3,875.00 <br />$10.00 <br />$250.00 <br />18 <br />2130.523 <br />WATER <br />MGAL <br />50 <br />$75.00 <br />$3,750.00 <br />$97.50 <br />$4,875.00 <br />$30.00 <br />$1,500.00 <br />19 <br />2211.507 <br />AGGREGATE BASE (CV) CLASS 5 (P) <br />C Y <br />329 <br />$35.00 <br />$11,515.00 <br />$54.00 <br />$17,766.00 <br />$60.00 <br />$19,740.00 <br />20 <br />2331.603 <br />JOINT ADHESIVE <br />L F <br />794 <br />$1.00 <br />$794.00 <br />$1.50 <br />$1,191.00 <br />$2.00 <br />$1,588.00 <br />21 <br />2360.504 <br />TYPE SP 9.5 WEAR CRS MIX(2,C) 3.0" THICK <br />S Y <br />167 <br />$28.00 <br />$4,676.00 <br />$42.25 <br />$7,055.75 <br />$30.00 <br />$5,010.00 <br />22 <br />2360.509 <br />TYPE SP 9.5 WEARING COURSE MIX (2,C) <br />TON <br />126 <br />$100.00 <br />$12,600.00 <br />$110.50 <br />$13,923.00 <br />$126.00 <br />$15,876.00 <br />23 <br />2360.509 <br />TYPE SP 12.5 NON WEAR COURSE MIX (2,C) <br />TON <br />251 <br />$100.00 <br />$25,100.00 <br />$99.50 <br />$24,974.50 <br />$121.00 <br />$30,371.00 <br />24 <br />2504.602 <br />IRRIGATION SYSTEM REPAIR <br />EACH <br />3 <br />$150.00 <br />$450.00 <br />$518.00 <br />$1,554.00 <br />$350.00 <br />$1,050.00 <br />25 <br />2531.503 <br />CONCRETE CURB & GUTTER DESIGN B618 <br />L F <br />794 <br />$24.00 <br />$19,056.00 <br />$24.00 <br />$19,056.00 <br />$23.10 <br />$18,341.40 <br />26 <br />2531.504 <br />7" CONCRETE DRIVEWAY PAVEMENT <br />S Y <br />38 <br />$80.00 <br />$3,040.00 <br />$83.00 <br />$3,154.00 <br />$110.25 <br />$4,189.50 <br />27 <br />2540.602 <br />TEMPORARY MAIL BOX <br />EACH <br />16 <br />$150.00 <br />$2,400.00 <br />$175.00 <br />$2,800.00 <br />$100.00 <br />$1,600.00 <br />28 <br />2557.602 <br />REPAIR DOG FENCE <br />EACH <br />3 <br />$150.00 <br />$450.00 <br />$340.50 <br />$1,021.50 <br />$150.00 <br />$450.00 <br />29 <br />2563.601 <br />TRAFFIC CONTROL <br />LS <br />1 <br />$10,000.00 <br />$10,000.00 <br />$1,225.00 <br />$1,225.00 <br />$40,000.00 <br />$40,000.00 <br />30 <br />2564.602 <br />INSTALL SALVAGED SIGN <br />EACH <br />3 <br />$150.00 <br />$450.00 <br />$325.00 <br />$975.00 <br />$350.00 <br />$1,050.00 <br />31 <br />2573.501 <br />STABILIZED CONSTRUCTION EXIT <br />LS <br />1 <br />$1,500.00 <br />$1,500.00 <br />$3,483.00 <br />$3,483.00 <br />$1,500.00 <br />$1,500.00 <br />32 <br />2573.502 <br />STORM DRAIN INLET PROTECTION <br />EACH <br />6 <br />$150.00 <br />$900.00 <br />$255.00 <br />$1,530.00 <br />$125.00 <br />$750.00 <br />