My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/04/2022 EB Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2022
>
05/04/2022 EB Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2022 9:43:00 AM
Creation date
4/29/2022 3:10:09 PM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
05/04/2022
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> <br />ENVIRONMENTAL BOARD <br />AGENDA ITEM 6B <br /> <br /> <br />STAFF ORIGINATOR: Andy Nelson, Environmental Coordinator <br /> <br />MEETING DATE: May 4th, 2022 <br /> <br />REQUEST: Otter Crossing 2nd Addition Preliminary Plat and <br />Tidal Wave Auto Spa Site Plan Review <br /> <br />APPLICANT: Tyme Properties <br /> Attn: Paul Schreier <br />3435 Labore Road Suite 150 <br /> Vadnais Heights, MN 55110 <br /> <br /> Bowman <br /> Attn: Jenny Baez <br /> 12355 Sunrise Valley Drive, Suite 520 <br /> Reston, VA 20191 <br /> <br />OWNER: Same <br /> <br /> <br /> <br /> <br />BACKGROUND <br /> <br />Two (2) separate Land Use Applications were submitted. The first applicant, Tyme <br />Properties, LLC, submitted Otter Crossing 2nd Addition preliminary plat to create two (2) <br />commercial lots. The second applicant, Bowman, submitted a conditional use permit and <br />site plan review for Tidal Wave Auto Spa, a commercial car wash, to be located on Lot 1 <br />of the preliminary plat. <br /> <br />This staff report is based on a review of the following documents: <br /> <br />• Otter Crossing 2nd Addition Preliminary Plat & Site Plans prepared by Pioneer <br />Engineering, dated April 1, 2022 <br />• Storm Water Management Plan prepared by Pioneer Engineering, revised June <br />22, 2021 <br />• Storm Water Pollution Prevention Plan prepared by Pioneer Engineering, dated <br />March 5, 2021 <br />• Concept Plan 5 prepared by Pioneer Engineering, dated April 6, 2020 <br />• Tidal Wave Auto Spa Site Development Plans prepared by Bowman, dated <br />February 1, 2022
The URL can be used to link to this page
Your browser does not support the video tag.