Laserfiche WebLink
4 <br /> <br />Required for 6,082 square feet of open space: 3 large trees <br /> 9 large shrubs <br /> <br />Provided: <br />7 large trees, counting the 7 honey locusts on the east perimeter. <br />6 large shrubs, counting the Autumn Jazz viburnums on the east perimeter. <br /> <br />3 additional large shrubs will be required in order to meet open space requirements. <br /> <br />Buffer and Screen Standards <br /> <br />The purpose of this requirement is to separate and buffer different land use types, screen <br />roads and parking, and screen utility and loading areas. Continuous, year-round planting <br />screens require, at the minimum, a double row of plants with triangulated spacing. <br /> <br />This project calls for a 30 inch high planting screen on the north and south perimeters. <br />Buffer and screen standards have been met. <br /> <br />Canopy Cover <br /> <br />Canopy cover standards call for a minimum of 40% canopy coverage. Canopy coverage <br />values are calculated per tree based on the anticipated size 15 years after planting, and the <br />distance to hardscape edge from the planting location. <br /> <br />Vehicular hardscape planned: 33,316 sq. ft. <br />Canopy cover requirement: 13,326 sq. ft. <br />Canopy cover provided: 16,200 sq. ft. <br /> <br />Canopy cover requirements have been met. <br /> <br />Foundation Landscaping <br /> <br />The purpose of these standards is to soften and enhance building architecture, define <br />access points, add color and seasonal interest, and to blend buildings in with the natural <br />environment. These standards apply to building fronts and sides facing public or private <br />streets. <br /> <br />2 large trees and 6 large shrubs are required per 100 linear feet of building. These plants <br />should be within 30 feet of the building. <br /> <br />The following substitutions are allowable: <br />1 large tree = 1.5 medium or 2 small trees <br />1 large shrub = 1.5 medium or 3 small shrubs <br /> <br />The applicable building faces for this project include the north, east, and south building <br />faces.