Laserfiche WebLink
<br />APPROVED MINUTES <br /> <br />Storm Water Management and Erosion and Sediment Control <br /> <br />No storm water management facilities are proposed. The City Engineer will review <br />and comment on the plan. <br /> <br />Tree Preservation <br /> <br />Currently there are 16 trees proposed for removal. Since these trees are located within <br />the BUA and are outside of the ESA, no tree mitigation is required. <br /> <br />Mr. Asleson would like to add protection of the oak trees in the area from construction. <br /> <br />Landscaping <br /> <br />No boulevard trees or open space landscaping are required <br /> <br />Environmental Assessment Worksheet (EAW) <br /> <br />An Environmental Assessment Worksheet is not mandated. <br /> <br />Wetlands <br /> <br />According to the report prepared by Kjolhaug Environmental Services Company, Inc., <br />two wetlands are identified on the subject site. Per the preliminary plat, the total <br />combined wetland area is 0.21 acres. <br /> <br />The site is located within the RCWD Wetland Management Corridor. Because of this <br />location, a conservation easement covering an average 50-foot wide wetland buffer is <br />required along the northern wetland. <br /> <br />Shoreland Management Overlay <br /> <br />The site is located in a Shoreland Management Overlay district. Baldwin Lake is a <br />classified as a Recreational Lake. A setback of 150 feet from the OHWL is required <br />for all primary and accessory structures. Impervious surface coverage of 30% applies <br />to all lots within the overlay district. The 150 foot setback from the OHWL does not <br />encroach onto Lot 1 or Lot 2 of the proposed development so is not an issue. <br />Impervious surface coverage will be reviewed with the building permit but given the <br />large size parcels, impervious coverage should not be an issue. <br /> <br /> <br /> <br />Comprehensive Plan Amendment <br />