My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/11/2022 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2022
>
05/11/2022 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2022 11:59:22 AM
Creation date
5/6/2022 3:01:51 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Minutes
Meeting Date
05/11/2022
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />5/6/2022 <br />Page 4 <br />(5/6/2022) Staff recommends adjusting landscaping so that no trees are planted <br />over or near utility pipes. <br />• Floodplain <br />No floodplain is present on the site. Staff does not have any comments. <br />• Drainage and Utility Easements <br />Drainage and utility easements are proposed within the site on the Otter Crossing 2nd <br />Addition preliminary plat. Per City Code, the City requires 10-ft wide drainage and utility <br />(D&U) easements along plat boundaries and along lot lines. <br />Comments: <br />1. (5/6/2022) This site is part of the Otter Crossing 2nd Addition plat. Engineering staff <br />reviewed the plat and provided comments in an Engineering Review Memo dated <br />5/4/2022. No comments were made about the D&U easements on Lot 1 with the <br />proposed plat. <br />00 Development Agreement <br />A Site Performance Agreement will be required for this site. <br />00 Grading Agreement <br />A Grading Agreement is not applicable at this time. <br />• Stormwater Maintenance Agreement <br />The stormwater facilities on the site will be privately maintained and a Stormwater <br />Maintenance Declaration will be required. <br />Comments: <br />(5/4/2022) The Stormwater Maintenance Declaration shall cover the storm <br />sewer in the proposed parking lot. The pond and storm sewer along Street A will <br />be covered under the Stormwater Maintenance Declaration for Otter Crossing <br />2nd Addition. <br />• Permits Required <br />1. City of Lino Lakes Zoning Permit for Grading <br />2. NPDES General Construction Permit <br />3. Minnesota Pollution Control Agency <br />4. Minnesota Department of Health <br />5. Rice Creek Watershed District Permit <br />If you or the applicant has any questions regarding these comments, please contact Diane <br />Hankee at (651) 982-2430 or dhankee@linolakes.us. You may also contact Kelsey Gelhar at <br />(612) 709-4897 or kgelhar@wsbeng.com. <br />Tidal Wave Auto Spa Engineering Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.